Year End Review of Ministry of Power - 2025
- Annual stock-take by the Ministry of Power (MoP) of the power sector across generation, transmission, distribution, energy conservation and consumer-side reforms for calendar year 2025.
- India crossed 500 GW installed capacity, with renewables crossing 50% of demand met in key periods — a structural shift in the energy mix.
- Examinable for GS-III (infrastructure, energy) and GS-II (governance schemes): peak demand met, AT&C losses, RDSS smart-metering, ISTS expansion for VRE, and tribal household electrification.