·The Hindu·15 marks·250–350 words

Accurate weather forecasting is the first line of disaster risk reduction. Examine this with reference to Mission Mausam.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Why forecasting is the first line
  2. How Mission Mausam strengthens it
  3. Gaps: forecasting is necessary, not sufficient
  4. Way forward

Disaster risk reduction begins before a hazard strikes: a cyclone, heatwave or cloudburst can be managed only if it is foreseen. Recognising this, the Union Cabinet approved Mission Mausam on 11 September 2024 with ₹2,000 crore over two years to make India "Weather-ready and Climate-smart" [3]. Forecasting is the first line of defence, but not the only one.

Observe → Forecast → Warn → Evacuate/Prepare → Reduced loss
 (radar,    (NWP       (impact-    (district
 satellite)  models)    based)      administration)

Fig: The early-warning chain. Forecasting is its first link.

Why forecasting is the first line

  • Lives saved: IMD reports overall forecast accuracy improved 40% in 2023 over 2014 [1]. Severe-weather forecasts (heavy rain, heat/cold waves, thunderstorms) improved 40–50% in a decade [2].
  • Impact-based forecasts say what rain will do (floods, landslides), not just how much will fall. This lets officials act early.
  • Economic resilience: agriculture, aviation, power and fisheries plan around forecasts [3].

How Mission Mausam strengthens it

  • Observation: next-generation Doppler Weather Radars, satellites with advanced sensors [3].
  • Computation: high-performance supercomputers. Model grid to be refined from 12 km to 6 km, so models can capture small, local storms [4].
  • Decision support: a GIS-based Decision Support System for officials [3].

Gaps: forecasting is necessary, not sufficient

  • Last-mile failure: before the Wayanad landslides (2024), IMD issued an orange alert and red-coded impact-based forecasts. The government says there was no lapse [5], yet many lives were lost. The weak link was turning the warning into evacuation.
  • Procurement delays: MoES says delays in procuring radars slowed fund use [6].
  • Sister bodies: CAG found INCOIS did not buy its planned Automatic Weather Stations because of fund constraints, which weakens the ocean data that cyclone forecasts depend on [7].
  • Short horizon: radars and supercomputers need longer funding than a two-year mission.
  • Self-reported accuracy: the accuracy claims come from IMD/MoES releases, with no independent audit [1][2].

Way forward

  • Give the mission multi-year funding and prioritise radar coverage in the hills.
  • Publish forecast-verification scores for each district.
  • Train district administrations to act on orange alerts.

Mission Mausam has strengthened the first link of the early-warning chain. That link saves lives only when the other links (communication, preparedness and response) are just as strong. Funding it for the long term and linking it to local action can turn IMD's 150-year legacy into the zero-avoidable-casualty resilience that SDG 13 calls for.

Sources

  1. 1PIB release on 150th Foundation Day of IMD and launch of Mission Mausam (MoES): 40% overall forecast accuracy improvement, 2023 vs 2014
  2. 2MoES Parliament reply on severe-weather forecast accuracy, 5 December 2024: 40–50% improvement in severe-weather forecasts over a decade
  3. 3PIB: Cabinet approves Mission Mausam with an outlay of Rs 2,000 crore over two years (MoES): approval date, outlay, radars, satellites, supercomputers, GIS-based DSS, beneficiary sectors
  4. 4Mission Mausam document, IMD: NWP resolution upgrade from 12 km to 6 km
  5. 5MoES reply in Rajya Sabha on Wayanad weather warnings (Unstarred Q. 999, February 2025): orange alert, red-coded impact-based forecasts, "no lapse" claim
  6. 6MoES Parliament reply on Mission Mausam fund utilisation (2026): fund-use delays due to procurement of Doppler Weather Radars
  7. 7CAG Compliance Audit Report on INCOIS (2025): Automatic Weather Stations not procured due to fund constraints

More from this note