China's Medog project has turned the Siang Upper Multipurpose Project from an energy project into a strategic one. Critically examine whether large storage dams are a sustainable response to upstream hydro-hegemony.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →The Siang Upper Project began as two separate hydropower stages: Stage-I (6,000 MW) went to NHPC and Stage-II (3,750 MW) to NEEPCO [5]. It has since been combined into one storage scheme of about 11,000 MW [3]. The aim is to protect India against China's 60 GW Medog dam at the Great Bend of the Yarlung Tsangpo, approved in December 2024 [2]. Storage gives India some insurance, but on its own it is not a complete response.
Why storage appeals: the strategic case
- Flood cushion: A large reservoir can absorb sudden water releases from upstream, whether accidental or deliberate.
- Lean-season security: Stored water can keep the river flowing downstream if China holds back water in dry months.
- No legal protection: India has no water-sharing treaty with China. The Expert Level Mechanism (2006) deals only with data, and even that data-sharing needs to be restarted [1]. Physical storage takes the place of legal leverage.
- Energy benefit: Reliable hydropower helps balance a grid with a growing share of renewables, which supports the Net Zero 2070 goal.
Why it may not be sustainable
- Lack of consent: The reservoir would flood ancestral Adi land. Surveys carried out with security forces present have triggered protests [4]. The Centre's reliance on "outreach and awareness" [3] falls short of the Gram Sabha consent required by the FRA, 2006 and the Social Impact Assessment required by the RFCTLARR Act, 2013.
- Earthquake and dam-safety risk: Arunachal lies in Seismic Zone V, where filling a huge reservoir can itself trigger earthquakes. A dam failure there would be a disaster India caused itself, so strict compliance with the Dam Safety Act, 2021 is essential.
- Ecological cost: The dam would trap sediment that keeps Assam's floodplains fertile. It would also change the natural flood cycle and harm river species.
- Conflicting purposes: To absorb floods, the reservoir must keep space empty. To generate power and supply dry-season flows, it must stay full. It cannot fully do both.
- Escalation: Answering a dam with a dam leads to rivalry rather than a solution. It also ignores Bangladesh, which lies downstream of both projects.
The Siang project does address a real weakness, but it uses an engineering fix for what is largely a diplomatic problem. A sustainable response would combine a smaller, carefully sized reservoir with an independent assessment of earthquake risk and of the combined effects of all dams in the basin. It would also need genuine free, prior and informed consent from affected communities. Alongside this, India should push for a basin-wide India–China–Bangladesh framework for data-sharing and consultation [1]. Security built with the Siang's people, not over them, would respect Article 46 and advance SDGs 6 and 13.
Sources
- 1Rajya Sabha Unstarred Question 393, Ministry of External Affairs, 6 Feb 2025: Expert Level Mechanism set up in 2006; resuming hydrological data-sharing; India monitoring China's Yarlung Tsangpo project
- 2MP-IDSA: China's Mega Dam on the Yarlung Zangbo: India's Concerns: 60 GW Medog dam at the Great Bend, approved December 2024; downstream concerns
- 3Rajya Sabha Unstarred Question 1591, 5 Aug 2024: about 11,000 MW storage project at preliminary investigation stage; villagers' concerns handled through outreach and awareness
- 4MP-IDSA: Siang Upper Multipurpose Project: Sustainability and Indigenous Rights: indigenous land-rights and consent concerns; local resistance
- 5Lok Sabha Answer on Siang Upper Stage-I/II allotment, Parliament Digital Library: Stage-I (6,000 MW) allotted to NHPC; Stage-II (3,750 MW) allotted to NEEPCO