"Creating assets without the capacity to maintain them leads to wasted investment." Examine this in the context of the Jal Jeevan Mission and the Nal Jal Mitra programme.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →In this answer
When the Jal Jeevan Mission (JJM) was launched in 2019, only 16.71% of rural households had tap water [2]. That number is now over 15.82 crore households [3]. The central outlay of ₹2.08 lakh crore has largely been spent [2], so the harder task now is keeping the taps working. The statement therefore holds largely true.
How weak maintenance wastes JJM's assets
- No money for upkeep: Maharashtra collected only ₹21.72 crore (~1%) of the ₹2,043.79 crore community contribution due [4].
- No rules: no O&M policy was in place, so nobody was clearly responsible for repairs [4].
- Panchayats left out: Gram Panchayats and VWSCs were not involved in building the schemes [4]. This goes against the 73rd Amendment, whose Eleventh Schedule lists drinking water as a Panchayat subject.
- Supply on paper only: some villages were declared Har Ghar Jal without every household getting water, and there was no way to measure the 55 lpcd norm [4].
- Lost benefits: WHO estimates that safe water could prevent about 4 lakh diarrhoeal deaths [2]. Pipes that sit idle give up that gain.
Nal Jal Mitra: how much of the gap it fills Strengths
- Under the DGT–DDWS MoU, at least 1 lakh youth will be certified. DDWS pays the whole ₹111.93 crore [1].
- The 165-hour NSQF-aligned course (120 h in class plus 45 h on the job) covers plumbing, pumps and water-quality checks [1].
- Convergence: it is a low-cost add-on to ITI Fitter and Plumber trades, and it creates village-level jobs.
Limitations
- It certifies people but does not employ them: states engage Mitras "as per their own policies" [1].
- Scale: 1 lakh Mitras [1] is fewer than the 1,74,348 Har Ghar Jal villages [2].
- Mismatch: trainees are drawn from ITIs, with no rule linking them to their home Gram Panchayat. Few women are in these trades.
- Maintenance cannot fix poor construction: only 25% of 1,730 solar-powered schemes in six districts had finished installation [4].
Way forward
- Draft state O&M policies, as the CAG recommended [4].
- Pay Mitras from user charges. One UP Gram Panchayat already charges ₹50 per household per month [3].
- Give Gram Panchayats the asset records held in the RPWSS ID registry [2].
- Team Mitras with the 24.80 lakh women trained to use field-testing kits [2], and count Mitras actually placed, not certificates issued.
JJM shows that assets turn into services only when people, money and institutions keep them running. Nal Jal Mitra is a good first step. Building it into Panchayat-led, user-funded O&M would make Har Ghar Jal last and move India towards SDG 6.
Sources
- 1PIB Press Release: DGT (MSDE)–DDWS MoU on Nal Jal Mitra Skilling Programme under JJM 2.0 (25 Nov 2026)1 lakh target, ₹111.93 crore paid by DDWS, 165-hour course, states engage Mitras as per their own policies
- 2PIB Backgrounder: Jal Jeevan Mission – ₹2.08 Lakh Crore Central Outlay, Tap Water to Over 15.72 Crore Rural Households (Oct 2025)2019 baseline, central outlay, WHO health estimate, Har Ghar Jal villages, RPWSS ID, FTK-trained women
- 3PIB Research: "Water for All, All for Water: People, Panchayats & Jal Jeevan Mission" (13 Mar 2026)15.82 crore households, ₹50 Gram Panchayat user charge
- 4CAG, Report No. 2 of 2026 – Performance Audit on Jal Jeevan Mission, Government of Maharashtra (Executive Summary)community contribution shortfall, no O&M policy, Panchayats left out, unverified Har Ghar Jal claims, solar schemes, O&M policy recommendation