·The Hindu·15 marks·250–350 words

Critically assess the progress of PMAY-G in achieving 'Housing for All' in rural India.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Achievements
  2. Shortfalls
  3. Way forward

The Ministry of Rural Development runs Pradhan Mantri Awas Yojana–Gramin (PMAY-G), India's largest rural housing scheme. It aims to give every houseless or kutcha-house family a pucca home with basic amenities. The scheme has built houses at a scale few countries have matched. However, too many approved houses are still unfinished, so 'Housing for All' is not yet achieved.

Achievements

  • Scale: Against a cumulative target of 4.12 crore houses, 3.84 crore have been sanctioned and 2.81 crore completed (August 2025) [2].
  • Renewed commitment: The Cabinet extended the scheme to 2028-29 to build 2 crore more houses. The outlay is ₹3,06,137 crore, and about 10 crore people are expected to benefit [1].
  • Transparency: Each instalment is released only after geo-tagged, time-stamped photos of the construction stage are uploaded. Progress is tracked through AwaasSoft and AwaasApp [3].
  • Livelihood and gender: Each beneficiary gets 90/95 person-days of MGNREGS wages for building their own house. Ownership is encouraged in women's names or jointly, which advances SDG 5 [3].
  • Convergence: Linking with Swachh Bharat Mission-Gramin, Jal Jeevan Mission and Ujjwala adds toilets, tap water and clean cooking fuel to the house [3].

Shortfalls

  • Missed deadline: The original target was 2.95 crore houses by 2023-24 [1]. Completions were still below that figure in mid-2025 [2].
  • Completion gap: About 1.03 crore sanctioned houses are not yet finished [2]. These families have a sanction letter but no home.
  • Assistance not raised: Phase II keeps the existing ₹1.20 lakh (plains) / ₹1.30 lakh (NER and hill States) per house [1]. As material costs rise, poor households risk taking on debt or leaving houses half-built.
  • Costly new technology: Andhra Pradesh's 3D Concrete Printing pilot will build 177 houses for ₹13.93 crore [4], or about ₹7.9 lakh per house. Faster building methods are still far costlier than the scheme pays per house.

Way forward

  • Review unit assistance regularly in line with construction costs.
  • Finish sanctioned houses before issuing new sanctions.
  • Evaluate technology pilots on cost and durability before scaling them up.

Overall, PMAY-G has turned rural housing into a scheme that is monitored digitally, gives women a stake in the home and links in other basic services. To finish the job, the scheme must close the completion gap and fund houses adequately. That would bring it closer to the Article 21 promise of a dignified life and SDG 11's goal of adequate housing for all.

Sources

  1. 1Cabinet approves implementation of the Pradhan Mantri Awaas Yojana – Gramin (PIB): Phase II target of 2 crore houses, ₹3,06,137 crore outlay, about 10 crore beneficiaries, original 2.95 crore target, unit assistance amounts
  2. 2Construction of Houses under Pradhan Mantri Awaas Yojana-Gramin (PIB): 4.12 crore target, 3.84 crore sanctioned, 2.81 crore completed
  3. 3PMAY-G: Advancing Housing for All in Rural India (PIB Press Note): geo-tagging and AwaasApp, MGNREGS 90/95 person-days, women's ownership, convergence with other schemes
  4. 43D-printed houses set to be built in A.P. under Centre's PMAY-G scheme (The Hindu, 4 Oct 2026): 177-unit pilot, ₹13.93 crore outlay