In 1976, the Geological Survey of India drilled about a dozen shallow holes (up to 200 m) at Manikaran and Rasoi, Kullu, "with little luck" [1]. Fifty years later, India's geothermal potential of about 10,600 MW is still theoretical [2]. Official sources admit that commercial-scale power "is yet to be established" [3]. Geology, risk and policy explain this lag.
Constraints
- Low-temperature resource: The hottest water found under Puga is only 135°C. At Gandhinagar, 70–80°C wells produced just 50–90 kW [3]. Most sites are better suited to heating than to running turbines.
- Potential exists mostly on paper: The 10,600 MW figure comes from GSI's Geothermal Atlas (2022). Of 381 hot springs, only 42 sites are "promising," and all still need further exploration [2].
- Drilling risk: Heat reaches near the surface only along faults and fractures [3]. An expensive well may therefore come up dry, as happened at Manikaran [1].
- Late policy and state-led effort: A national framework arrived only in September 2025 [2]. Drilling is still done by public bodies such as the ONGC Energy Centre [3].
- Socio-ecological sensitivity: Local people use Himalayan springs for bathing and cooking, and the springs are central to local religious belief [1]. Drilling there needs safeguards.
Prospects under the 2025 Policy
- Institutional push: With MNRE as the nodal ministry, the policy backs drilling, a national geothermal data repository, pilot projects and Centres of Excellence, and it is open to both public and private firms [3].
- First milestone: In July 2026, two 1,000 m wells were commissioned at Puga, Ladakh, leading towards India's first 1 MW demonstration plant [3].
- Lower drilling risk: The policy allows abandoned oil and gas wells to be repurposed, with pilots at Ankleshwar [3] and an IIT Madras R&D project [2].
- Direct use: Ground Source Heat Pumps and a Hyderabad geothermal cooling project [3] build on Ladakh's 1976 greenhouse use [1].
- Baseload and partnerships: Geothermal is weather-independent, unlike solar and wind [3]. India cooperates with Australia, Iceland, Saudi Arabia and the USA [2].
- Limits: The policy summary sets no capacity target, timeline or tariff. Growth still depends on public money [3].
Overall, geothermal will remain a small part of grid supply, but it can provide steady, low-carbon energy for remote regions and for heating and cooling. The way forward is to open the data repository early, share exploration risk with private investors, and fund direct-use projects through RE-RTD [3]. Done well, geothermal can be a small but steady support for Net Zero 2070 [3] and SDG 7.
Sources
- 1"Electricity from Hotwater Springs" (50 Years Ago), The Hindu, 28 September 20261976 GSI drilling at Manikaran/Rasoi, ~12 holes up to 200 m, "little luck"; local uses of the springs; Ladakh greenhouse use
- 2Rajya Sabha Unstarred Question No. 1097, "Harnessing of Geothermal Energy", MNRE, answered 09.12.202510,600 MW theoretical potential (Geothermal Atlas 2022); 381 hot springs, 42 promising sites; policy notified 15 September 2025; IIT Madras abandoned-well project; cooperation with Australia, Iceland, Saudi Arabia, USA
- 3PIB Backgrounder, "Geothermal Energy: A New Chapter in India's Clean Energy Journey" (4 September 2026)135°C at Puga; Gandhinagar 50–90 kW; "commercial-scale power generation is yet to be established"; policy provisions; Puga wells and 1 MW demonstration; Ankleshwar pilot; Hyderabad cooling; GSHPs; RE-RTD; weather-independence; Net Zero 2070