·The Hindu·15 marks·250–350 words

Discuss the ecological and social costs of large hydropower projects in the Eastern Himalaya. Suggest a framework that balances energy security with tribal rights.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Ecological costs
  2. Social costs
  3. A balancing framework

The Eastern Himalaya is a biodiversity hotspot, and all of North-East India lies in seismic Zone V [2]. The region holds much of India's untapped hydropower. The Adi community is protesting the Siang Upper Multipurpose Project (SUMP), which protesters say would submerge 27 villages [1]. Their protest shows that energy security gained without tribal consent is neither just nor durable.

Ecological costs

  • Seismic risk: Large reservoirs would sit in India's most earthquake-prone zone [2]. A dam failure would threaten the Assam plains below.
  • Sediment trapping: Dams hold back the silt that renews the Brahmaputra floodplains, which makes erosion worse downstream.
  • Altered flows: Peaking operations cause daily surges and low flows that hurt fisheries and farming along the river.
  • Biodiversity loss: Flooding forests breaks up the habitats of species found only in this region.
  • Cumulative stress: Projects are cleared one at a time, even though the Siang, Subansiri and Dibang dams and China's upstream dam all sit on one river system.

Social costs

  • Displacement: Entire villages face submergence. Cash compensation cannot replace land the community holds in common [1].
  • Cultural erosion: The Adi see the dam as a threat to their "civilisation", not just their property [1].
  • Flawed consent: The community alleges "deceit, force and threats" were used, even for consent to a feasibility study [1].
  • Securitisation: Barricades and Central-force check posts have turned consultation into confrontation [1].
  • Costly delays: NHPC's Lower Subansiri project stalled from 2011 to 2019 because of agitations [3].

A balancing framework

Basin-wide impact study → Free, prior, informed consent → Independent expert review → Benefit-sharing → Transparent operation

Figure: The order in which hydropower decisions should be taken

  • Basin-wide impact study: Assess the combined impact of all dams in the basin under the EIA Notification, 2006, before any site survey.
  • Free, prior and informed consent (FPIC): Seek consent through gram sabhas and the Adi customary councils (Kebang) under the Forest Rights Act, 2006, as the Supreme Court upheld in the Niyamgiri case (2013) [4]. No cash offers in return for consent and no armed escorts for survey teams.
  • Independent expert panel: Include downstream Assam on the panel and fix a minimum flow that must always be released. Subansiri work resumed only after local issues were settled and the National Green Tribunal cleared the project [3].
  • Benefit-sharing: Give host communities a share of free power, equity and local jobs. Resettle displaced families on replacement land under the RFCTLARR Act, 2013.
  • Right-sizing: The government should state whether SUMP is meant mainly as a strategic buffer or for peak power. It should also consider a series of smaller run-of-river plants instead.

Fragile ecology and tribal identity are not obstacles to energy security; they are conditions for it. A basin-wide approach that puts consent first would honour Article 46's duty to protect Scheduled Tribes from exploitation and support SDGs 7 and 15. It can make Himalayan hydropower both secure and legitimate.

Sources

  1. 1The Hindu, "The Siang dam and a threatened homeland" (Abhinay Lakshman, 7 Nov 2026)Adi opposition, 27 villages submerged, alleged deceit and force, security check posts *(article page could not be verified; domain root linked)*
  2. 2PIB, "Seismic Zoning of India"all of North-East India lies in seismic Zone V
  3. 3PIB, "Subansiri Lower Hydroelectric Project Achieves Construction of Dam till Top Level"work stalled Dec 2011 to Oct 2019 due to agitations; resumed after NGT clearance
  4. 4Supreme Court of India, Orissa Mining Corporation v. MoEF (2013) 6 SCR, Supreme Court Reportsgram sabha authority to decide on community and cultural rights under the FRA

More from this note