Discuss the significance of the Hub-and-Spoke model adopted under PM-SETU in transforming India's ITI ecosystem. What administrative challenges could hinder its nationwide rollout?
Approved by the Cabinet in May 2025 and launched on 4 October 2025 [3], PM-SETU seeks to upgrade 1,000 Government ITIs with an outlay of ₹60,000 crore [1]. Its Hub-and-Spoke design is the scheme's central institutional innovation, shifting ITI reform from isolated institutions to industry-anchored clusters.
Significance for the ITI ecosystem
- Clustered upgradation: 200 Hub and 800 Spoke ITIs, each hub linked to roughly four spokes, creating clusters with modern labs, smart classrooms and incubation facilities [2].
- Resource efficiency: capital-intensive equipment sits in the hub and is shared by spokes, avoiding duplication and extending modern training to smaller district ITIs.
- Industry ownership: upgradation runs through industry-led Special Purpose Vehicles where the Anchor Industry Partner holds majority management control alongside the State [2], embedding employer accountability for outcomes.
- Demand-aligned trades: State-led selection in consultation with industry ties courses to local industrial potential [2] — visible in ArcelorMittal Nippon Steel (Gujarat) and Jindal Naveen Avasar (Odisha) anchoring ₹1,237.58 crore of Strategic Investment Plans [4].
- Apex support: five NSTIs (Bhubaneswar, Chennai, Hyderabad, Kanpur, Ludhiana) are being developed as centres of excellence for trainer capacity [1].
Administrative challenges to nationwide rollout
- Uneven State capacity: rollout across all 200 clusters is calibrated to industry readiness and implementation capacity [4], risking concentration in industrialised States and neglect of eastern and North-Eastern regions with thin anchor-industry interest.
- Accountability in SPVs: private majority control over publicly funded assets demands robust oversight of asset use, fee structures and exit conditions.
- Fund convergence: blending Central, State and industry shares [1] requires synchronised State budgeting; delays in one leg stall the cluster.
- Human resources: instructor vacancies and retraining for new-age trades remain the binding constraint.
- Hub-Spoke asymmetry: spokes may be reduced to peripheral feeders without guaranteed access norms.
The model's promise lies in converting ITIs from supply-driven institutions into demand-linked clusters. Realising it needs transparent SPV governance, outcome-linked disbursement and targeted handholding for weaker States, so that skilling genuinely converts India's demographic dividend into inclusive growth.
Sources
- 1Ministry of Skill Development and Entrepreneurship invites Industry to lead Upgradation of ITIs under PM-SETU Scheme, PIB₹60,000 crore outlay, 1,000 ITIs, NSTI component, Centre-State-industry funding
- 2The Hub and Spoke Model under PM-SETU, PIB200 Hub : 800 Spoke structure, one hub to four spokes, industry-led SPV with majority management control, State-led selection
- 3PM to unveil various youth-focused initiatives worth more than ₹62,000 crore on 4th October, PIBlaunch date of PM-SETU
- 4Jindal, ArcelorMittal, Apollo Med-Skills anchor ₹1,237.58 crore ITI transformation as PM-SETU goes nationwide across Odisha, Gujarat and Telangana, PIBStrategic Investment Plans, anchor partners, nationwide rollout across 200 clusters keyed to industry readiness
Practice
11 questions on this item
Check the answer for each question, or reveal all at once.