·The Hindu·15 marks·250–350 words

Discuss the technological challenges India has faced in keeping the NavIC constellation running, and the steps taken to fix them.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Technological challenges
  2. Steps taken

NavIC (IRNSS) is India's regional satellite navigation system. It covers the Indian landmass and 1,500 km beyond it [1]. For basic positioning it needs at least four operational satellites [4]. Keeping that minimum running has been a recurring technological struggle, and the next-generation NVS series is now closing the gap.

Technological challenges

  • Atomic clock failures: first-generation satellites relied on imported clocks. IRNSS-1F completed its 10-year design life on 10 March 2026, and its procured atomic clock stopped three days later. The satellite now serves only one-way messaging [3].
  • Below the operational threshold: as of July 2026, only three satellites were providing PNT services. That meant no standalone position fix, only timing service [4].
  • Orbit-raising failure: NVS-02 was launched successfully on GSLV-F15 in January 2025. It was left in an elliptical orbit because the oxidiser valves for its thrusters did not open [2].
  • Ageing fleet, thin margin: older satellites are reaching end of life before replacements arrive. With no in-orbit spare, one fault can cut service. IRNSS-1F's loss could not be covered until a new satellite reached orbit [3][4].
  • Limited interoperability: first-generation signals (L5, S-band) did not work with mass-market handsets, which slowed civilian adoption.

Steps taken

  • Next-generation NVS series: NVS-03 was launched on GSLV from Sriharikota on 30 October 2026. It reached geosynchronous orbit after four manoeuvres, and its health is normal [1]. Once in-orbit checks are complete, it should restore the four-satellite minimum.
  • Indigenous atomic clock: it flies alongside procured clocks and reduces dependence on imports [1].
  • New L1 band: added to L5 and S-band, it makes NavIC compatible with civilian and smartphone receivers [1].
  • Propulsion confidence: the four clean manoeuvres suggest the NVS-02 problem has been overcome [1].
  • Replacement pipeline: NVS-04 and NVS-05 are in advanced stages of realisation [4].

NavIC's setbacks came from clocks, propulsion and replacement timing, not from the concept itself. The way forward is to launch replacements before design lives end, keep at least one in-orbit spare, move fully to indigenous clocks and publish failure analyses. These steps would make NavIC a dependable pillar of Atmanirbhar Bharat and of India's strategic autonomy in Positioning, Navigation and Timing.

Sources

  1. 1NVS-03 reaches intended orbit, The Hindu, 5 Nov 2026 (news report)NVS-03 launch, geosynchronous orbit after four manoeuvres, indigenous and procured clocks, L1/L5/S bands, 1,500 km coverage
  2. 2ISRO: GSLV-F15 / NVS-02 MissionNVS-02 launch on GSLV-F15; oxidiser valves did not open, satellite left in elliptical orbit
  3. 3ISRO: IRNSS-1F successfully completed its mission life of 10 yearsdesign life ended 10 March 2026; procured atomic clock stopped 13 March 2026
  4. 4PIB: Parliament Question, Operational Status of NavIC Constellation (July 2026)four-satellite minimum for positioning; only three giving PNT; NVS-04 and NVS-05 in advanced stages

More from this note