Distributed solar is turning consumers into producers. Examine the role of PM Surya Ghar and PM-KUSUM in making India's energy transition more democratic.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →In this answer
India's solar growth used to come mostly from large solar parks. That is changing. Distributed solar made up 36% (16.3 GW) of the record 44.61 GW added in FY 2025-26 [1]. PM Surya Ghar and PM-KUSUM turn households and farmers into "prosumers" who both use and produce power. So far, though, they have delivered only part of what they promise.
Role of PM Surya Ghar: households as producers
- Launched on 13 Feb 2024 with an outlay of ₹75,021 crore. It offers rooftop subsidies and collateral-free loans, which helps households that are not well-off [1].
- Its target of 1 crore households by 2026-27 gives ordinary citizens a direct stake in the transition [2].
Role of PM-KUSUM: farmers as energy entrepreneurs
- Launched in 2019. It covers solar pumps, solarising farm feeders and small decentralised plants [1].
- Farmers can sell surplus power to discoms, which gives them a second source of income [1].
- Off-grid solar pumps that replace diesel pumps are the most advanced part, at 60% completion (Component-B) [2].
Why this makes the transition more democratic
- Ownership: power is now produced by millions of small owners, not just a few large developers [1].
- Participation and climate: more people take part as demand spreads beyond utilities, and this supports the 500 GW non-fossil target for 2030 [1].
Where the schemes fall short
- Low uptake: PM Surya Ghar had reached only 16 lakh households (16%) by June 2025. Low consumer awareness was a major reason [2].
- Uneven progress: PM-KUSUM's grid-connected parts lag, with Component-A at 6% and Component-C at 17% [2].
- Weak discoms: the parts that need discoms move slowly. Discoms have also left ~44 GW of auctioned capacity without signed PPAs [2].
Way forward
- The Standing Committee on Energy (2025) recommended closer monitoring of PM-KUSUM, more central assistance for pumps above 7.5 HP in water-scarce areas, and strict enforcement of discoms' renewable purchase duties [2].
- Awareness campaigns run through panchayats and urban local bodies could address the low uptake.
These schemes have started to spread both the ownership and the benefits of India's energy transition. Faster delivery, financially healthy discoms and better public awareness can turn this start into a transition owned by citizens. That would advance SDG 7 (affordable and clean energy) and India's Panchamrit commitments.
Sources
- 1PIB: review of India's decade of solar expansion (17 Nov 2026)36% distributed share of FY 2025-26 additions; PM Surya Ghar launch, outlay and loans; PM-KUSUM design and sale of surplus power; 500 GW target
- 2Standing Committee on Energy, "Performance Evaluation of Solar Power Projects in the Country" — PRS summary (2025)1 crore target and 16% progress; awareness gap; PM-KUSUM component progress; ~44 GW without PPAs; Committee recommendations