Even though drone surveys are almost complete, the issue of Property Cards under SVAMITVA lags behind. Identify the bottlenecks and suggest Centre-State measures to reach saturation.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →In this answer
SVAMITVA was launched on 24 April 2020 under the Ministry of Panchayati Raj (MoPR). It gives owners of homes in the inhabited (Abadi) part of a village a legal Record of Rights, issued as a Property Card [2]. As of November 2026, drones had surveyed 98% of the 3.33 lakh target villages, but only 66% had cards [1]. The work is stuck after the survey, mostly at stages the States control.
Drone survey (SoI) ──► Ground verification (States) ──► Objections & claims ──► Cards
98% 81% (backlog) 66%
Fig: Where villages get stuck in the SVAMITVA process [1]
Bottlenecks
- Verification backlog: About 59,000 villages have a drone map but no ground verification yet. State Revenue Departments, which do this work, have limited staff [1].
- Objections and claims: About 49,000 villages have been verified but still have no cards. Disputes over boundaries and claims by co-heirs take time to settle [1].
- Split responsibility: Survey of India flies the drones, States verify and MoPR coordinates. The Centre cannot do the slow steps itself [1].
- Pace too slow for the deadline: Villages with cards rose from 1.61 lakh in March 2025 [2] to 2.20 lakh in November 2026 [1], about 3,000 a month. Reaching all villages by 31 March 2027 needs roughly nine times that speed.
- Unclear funding: The ₹566.23 crore outlay covers only up to FY 2025-26 [2], but the deadline falls in FY 2026-27.
- Few loans: Only 16,614 loans have been taken against cards, in just seven States/UTs [1]. Households see little benefit, so they have less reason to push for their cards.
Centre-State measures
- Centre: Publish each State's progress at each stage on the online monitoring dashboard [2], name the funding for FY 2026-27, and strengthen Programme Management Units in States that are behind [2].
- Centre: Get banks, through State Level Bankers' Committees, to accept Property Cards as collateral in States beyond the current seven [1].
- States: Prepare the time-bound, mission-mode plans the Centre has asked for [1]. Put more revenue staff on verification and hold special village camps to hear objections.
- States: Report how many disputes were settled, not just how many cards were issued, so speed does not cost fairness.
- States: Give Gram Panchayats the power to levy property tax (under Article 243H). The scheme sends this tax to Panchayats only where States have done so [2], and the revenue would give Panchayats a reason to help finish the work.
- Jointly: Run IEC (awareness) campaigns [2] so villagers come forward during the objections stage.
In short, the drone work is nearly done; what remains is State administrative work. Clear funding from the Centre, State-level time-bound plans and work by Panchayats, in a spirit of cooperative federalism, can turn the 31 March 2027 deadline into secure property rights. This would serve Gram Swaraj and SDG 1.4 (equal rights to land and property).
Sources
- 1PIB, Ministry of Panchayati Raj: SVAMITVA review meeting, 20 Nov 2026stage-wise progress (98% / 81% / 66%), 3.28 lakh, 2.69 lakh and 2.20 lakh villages, 3.33 lakh target, 31 March 2027 deadline, 16,614 loans in seven States/UTs, State time-bound plans, roles of SoI, States and MoPR
- 2PIB backgrounder "Building a Self-Reliant India: 5 Years of SVAMITVA Scheme", 23 Apr 2025launch date, Record of Rights, 1.61 lakh villages (Mar 2025), ₹566.23 crore outlay up to FY 2025-26, online dashboard, PMUs, IEC, property tax going to Panchayats or the State