·PIB·15 marks·250–350 words

Examine the potential and the challenges of the National Green Hydrogen Mission in decarbonising India's hard-to-abate sectors.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Potential
  2. Challenges

Hard-to-abate sectors like fertiliser, refining, steel and shipping need hydrogen as a raw material or need very high heat. Renewable electricity alone cannot replace these uses. The National Green Hydrogen Mission (NGHM), launched in 2023 with an outlay of ₹19,744 crore, targets at least 5 MMT of green hydrogen a year by 2030 [1][2]. Its potential is large, but delivery so far is lagging.

Potential

  • Replacing raw materials: today, fertiliser and petrochemical plants make their hydrogen from natural gas. Green hydrogen can replace it, cut gas imports and avoid nearly 50 MMT of greenhouse-gas emissions a year [1].
  • Wider reach: the Mission funds pilot projects in steel, heavy-duty transport and shipping, so it covers more than fertiliser [1].
  • Support for producers and buyers: SIGHT (₹17,490 crore) pays incentives for making electrolysers in India and for producing green hydrogen [1]. Contracts have been signed to supply 6.7 lakh MTPA of green ammonia to 11 fertiliser units [2].
  • Economic gains: the Mission expects ₹8 lakh crore of investment and over 6 lakh jobs, and aims to make India an export hub [1].

Challenges

  • Very little capacity is running: only about 8,000 TPA was commissioned by February 2026. That is less than 0.2% of the target [3].
  • High cost: refinery tenders priced green hydrogen at ₹387–397/kg (including GST). Renewable power makes up 50–70% of production cost, according to a World Bank estimate [3].
  • Most output is for export: 23 purchase contracts cover about 5.5 lakh MTPA, roughly 11% of the target. Over 70% of that is meant for export [2], so Indian industry gets less of the emissions benefit.
  • Power and grid limits: the target needs about 125 GW of new renewable capacity [1]. But the intra-state Green Energy Corridor had connected only 29 GW of its 43 GW target to the grid by June 2026 [4].
  • Early stage in steel and shipping: these sectors are still at the pilot stage [1].

Overall, the NGHM has created domestic buyers and discovered real prices, but production at scale has not yet followed. The next steps should be:

  • extend SIGHT-style purchase support from fertiliser to refineries and steel;
  • add renewable capacity, storage and transmission together, so that cheap round-the-clock power brings costs down.

Done well, the Mission could make India's industrial growth low-carbon, in line with SDG-7 (clean energy) and SDG-13 (climate action) and the net-zero 2070 goal.

Sources

  1. 1PIB Explainer: National Hydrogen Mission – Decarbonising India, Achieving Net-Zero Vision (MNRE, updated Jan 2023): outlay ₹19,744 cr; SIGHT ₹17,490 cr; 5 MMT target; 125 GW of renewables; ~50 MMT of emissions avoided; ₹8 lakh cr investment and 6 lakh jobs; fertiliser and petrochemical use; pilots in steel, transport and shipping
  2. 2PIB: India Leads Globally with Green Hydrogen Offtake Commitments Exceeding 5.5 Lakh MTPA Till October 2026: Mission launched 2023; 23 contracts for ~5.5 lakh MTPA (~11% of target); over 70% for export; 6.7 lakh MTPA of green ammonia for 11 fertiliser units
  3. 3PIB: India Commissions 8,000 TPA Green Hydrogen Capacity till February 2026: 8,000 TPA commissioned; refinery tender prices ₹387–397/kg; renewable power 50–70% of cost (World Bank)
  4. 4MNRE, Lok Sabha Unstarred Question No. 1630 (29.07.2026): Green Energy Corridor Phases I and II had connected 29 GW of the 43 GW target as on 30.06.2026