Examine the role of the DRDO–DPSU–certification-agency ecosystem in achieving Aatmanirbharta in defence. What bottlenecks remain?
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →In this answer
Self-reliance in defence needs a full chain: a lab that designs, a factory that builds, a certifier that checks and a force that inducts. DRDO's maiden live jump of the Advanced High-Altitude Parachute (AHAP) at Nyoma, Ladakh (Oct 2026) shows this chain working end to end [1]. However, gaps in moving from prototype to induction persist.
Role of the ecosystem
- DRDO labs (design): ADRDE, Agra designed AHAP, a static-line parachute for mass drop of troops at up to 18,000 ft [1]. With DEBEL, Bengaluru, it also developed MCPS, the only Indian service parachute that can be deployed above 25,000 ft [2].
- DPSUs (production): Ordnance Parachute Factory, Kanpur makes AHAP [1]. It now works under Gliders India Limited, one of the companies formed when the OFB was corporatised in 2021 to bring autonomy and accountability [4].
- Certification agencies (independent checks): DGAQA inspects and CEMILAC certifies airworthiness [1]. Keeping these roles separate builds checks into the process.
- Technology handover: after the lab handed over the AHSP for the P-7 heavy-drop parachute, the Army ordered 146 systems [3]. This is the template for going from design to induction.
ADRDE (design) → OPF/GIL (build) → DGAQA (inspect) → CEMILAC (certify) → AHSP → Army order
Fig.: Indigenous lab-to-field chain
Bottlenecks that remain
- Delays: the Standing Committee on Defence found that 23 of 55 DRDO projects were not completed on time. It cited technical difficulties, denial of foreign technology and rising costs [5].
- Funding squeeze: DRDO's share of defence spending keeps falling, and R&D allocations fell short of what was asked for [5]. This hurts the costly phase of repeated trials.
- Gap between prototype and induction: AHAP's first jump was from 16,000 ft, below its 18,000 ft ceiling, and it was a single jump, not a mass drop. No AHSP handover or order has been announced yet [1].
- Scaling up production: GIL still has to show it can produce at battalion scale, to the prototype's standard, at a cost the Army will pay [4].
- Weak reviews: delays continued despite reviews at several stages [5].
The DRDO–DPSU–certifier chain has given India fully domestic designs, manufacturing and certification, as AHAP and MCPS show. The way forward is time-bound user-trial and induction roadmaps, more money for trials, and standard review benchmarks, as the Standing Committee recommended [5]. These steps would turn proofs of concept into equipment the forces actually use, and make Aatmanirbhar Bharat real along the frontiers.
Sources
- 1DRDO Conducts Maiden Live Jump of Advanced High-Altitude Parachute, PIB, 06 Oct 2026AHAP designer, manufacturer, DGAQA/CEMILAC roles, altitudes, induction status
- 2Military Combat Parachute System successfully tested at 32,000 feet, PIB, Oct 2025MCPS developers; only system deployable above 25,000 ft
- 3DRDO hands over AHSP of P-7 Parachute System, DRDO press release, 13 Nov 2024AHSP handover; Army order for 146 P-7 systems from GIL (OPF) Kanpur
- 4Seven new Defence companies carved out of Ordnance Factory Board, PIB, Oct 2021OFB corporatisation, GIL, autonomy and accountability
- 5Standing Committee on Defence: Review of the Working of DRDO, PRS report summary23/55 projects delayed, reasons, falling R&D share, review-benchmark recommendations