·The Hindu·15 marks·250–350 wordsPolityEnvironment

Examine the tension between eco-sensitive zone regulation and state development priorities, citing the Kaziranga ESZ reduction proposal.

In this answer
  1. The ecological case for a wide buffer
  2. The development counter-pressure
  3. Where the tension actually bites — compliance

Eco-Sensitive Zones (ESZs), notified under the Environment (Protection) Act, 1986, act as "shock absorbers" around protected areas, regulating land use in their fringes [3]. Assam's proposal to shrink Kaziranga's ESZ from 10 km to 1 km illustrates how ecological buffers collide with State development ambitions — a tension that is real, but often exaggerated by weak enforcement rather than by regulation itself.

The ecological case for a wide buffer

  • ESZ guidelines require inclusion of wildlife corridors and landscape connectivity; Kaziranga's animals move to the Karbi Anglong hills during annual floods [3].
  • The Supreme Court's order of 12.04.2019 banned all mining along the park's southern boundary and in catchments of streams rising in Karbi Anglong [1].
  • Kaziranga is a UNESCO World Heritage Site holding the bulk of the world's one-horned rhinos — habitat loss here is irreversible [4].

The development counter-pressure

  • Wide buffers constrain quarrying, crushers, highways and tourism infrastructure, and States see them as a brake on revenue and connectivity.
  • Assam defends the reduction as conformity with the Court's minimum 1 km ESZ norm; the Court in 2023 itself found uniform 1 km zones difficult to implement where large populations live nearby, permitting site-specific zones [2].
  • Crucially, that flexibility was granted to protect livelihoods, not to enable extractive activity; the reduction also remains a proposal, not a final notification.

Where the tension actually bites — compliance

  • Mining persisted in Karbi Anglong despite the 2019 ban; the State reported closing 28 stone quarries and 18 stone crushers only afterwards [1].
  • The Court's Central Empowered Committee has repeatedly flagged State inaction, including delay in the ordered watershed drainage analysis — showing an implementation, not a mapping, deficit.

The conflict is therefore less regulation-versus-growth than regulation-versus-enforcement. A scientifically delineated, watershed- and corridor-based ESZ, framed with local communities and backed by transparent compliance reporting, can secure both livelihoods and Kaziranga — honouring the State's duty under Article 48A and SDG 15.

Sources

  1. 1PIB, Ministry of Environment, Forest and Climate Change — Parliament Question: Diversion of Eco-Sensitive Land near Kaziranga National ParkSupreme Court order dated 12.04.2019 banning mining along Kaziranga's southern boundary and Karbi Anglong catchments; closure of 28 stone quarries and 18 stone crushers
  2. 2In Re: T.N. Godavarman Thirumulpad v. Union of India, Supreme Court of India, judgment dated 26 April 2023modification of the uniform 1 km ESZ direction as impractical; site-specific ESZs permitted
  3. 3PIB, MoEFCC — Development of Infrastructure on Eco-Sensitive ZonesESZ notification under the Environment (Protection) Act, 1986; inclusion of corridors and connectivity areas
  4. 4PIB — Kaziranga National ParkWorld Heritage status and one-horned rhino significance
Practice
12 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

More from this note

More on Polity