·PIB·15 marks·250–350 wordsGeographyEconomyEnvironment

Hydropower and water resources could be the cornerstone of India–Nepal relations, yet projects like Pancheshwar have stalled for decades. Analyse the reasons and suggest a way forward.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Reasons for the stalemate
  2. Signs of momentum
  3. Way forward

Nepal's rivers give it large hydropower potential, and India is its natural buyer and downstream partner. In 2014, India and Nepal agreed to finalise the Pancheshwar DPR and begin implementation within a year [2]. In November 2026, bodies were still only being "directed" to finalise it [1]. The causes are political and institutional rather than technical.

Reasons for the stalemate

  • Benefit-sharing deadlock: As a multipurpose project, Pancheshwar gives India, which lies downstream, mainly irrigation and flood control. Nepal gets mainly power [1]. Pricing each benefit and splitting the costs is a political choice that engineers cannot settle.
  • No deadlines: The 2014 timelines slipped [2]. The 2026 release sets no date for Pancheshwar, and the Saptakoshi and Sunkoshi DPRs are only being "accelerated" [1].
  • Trust deficit: Boundary "outstanding issues" were referred to the Foreign Secretaries, not settled [1]. The political trust that water deals need is still incomplete.
  • Market uncertainty: Nepal can sell power only through India's grid. The rules are India's own Cross-Border Electricity Guidelines, 2018, which India can amend alone [5]. This weakens investor confidence.
  • Slow delivery: The Lower Arun agreement was signed in 2023 [6], but its foundation stone was laid only in 2026 [1]. Parliament's External Affairs Committee has urged regular monitoring so that projects funded by Indian Lines of Credit (LoCs) finish on time [7].

Signs of momentum

  • Nepal already exports over 650 MW of power to India [3]. SJVN is developing the 669 MW Lower Arun project [4].
  • The 2026 Joint Vision links the Long Term Power Trade Agreement (LTPTA) to a power-sector vision document. It backs energy projects with an INR 11,500 crore Rupee LoC [1].

Way forward

  • Split the problem: The Joint Committee on Water Resources should first agree the cost-sharing formula as a separate step. The Pancheshwar Development Authority can then finish the engineering DPR.
  • Price downstream benefits: Pay Nepal for flood control and irrigation, not only for electricity.
  • Joint rules: Write the key power-purchase terms into the LTPTA framework so neither side can change them alone [5].
  • Time-bound tracking: Publish milestones for DPRs and LoC projects, as the Parliamentary Committee advised [7].

Pancheshwar is held up by mistrust and benefits nobody has priced, not by engineering. A rule-based, time-bound partnership that shares benefits fairly can turn the Joint Vision of "Viksit Bharat and Samunnat Nepal" into reality [1]. That would give substance to Neighbourhood First and to SDG 7 (affordable, clean energy).

Sources

  1. 1Joint Press Release on the State Visit of the Prime Minister of Nepal to India, PIB (Nov 2026)Pancheshwar DPR "directed" with no deadline; Saptakoshi/Sunkoshi "accelerated"; multipurpose benefits; boundary issues referred to Foreign Secretaries; Lower Arun foundation stone; LTPTA and power vision document; INR 11,500 crore energy LoC; Joint Vision title
  2. 2Joint Press Statement on the Visit of the Prime Minister to Nepal, PIB (2014)2014 commitment to finalise the Pancheshwar DPR and begin implementation within one year
  3. 3MEA Annual Report 2023Nepal exports more than 650 MW of power to India
  4. 4India–Nepal Bilateral Brief (as on 20 June 2024), MEALower Arun HEP, 669 MW, developed by SJVN
  5. 5Guidelines for Import/Export (Cross Border) of Electricity, 2018, Ministry of PowerIndia's own rules for cross-border power trade, amended by India alone
  6. 6List of Outcomes: Official Visit of Prime Minister of Nepal to India, MEA (June 2023)Lower Arun Project Development Agreement between SJVN and Investment Board Nepal
  7. 7India's Neighbourhood First Policy: Standing Committee on External Affairs Report Summary, PRS (2023)call for regular monitoring and timely completion of LoC projects
Practice
8 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →

More from this note

More on Geography