  1. Evidence of the shift
  2. Gaps that keep the shift incomplete
  3. Way forward

Section 47 of the Disaster Management Act, 2005 created the National Disaster Mitigation Fund (NDMF), which pays for reducing risk before a disaster strikes [1]. In landslide management, India is moving from relief after a slope fails to anticipating the failure [2]. The shift is real in forecasting but still incomplete in land-use control.

Evidence of the shift

  • Understanding risk: NDMA's National Landslide Risk Management Strategy (2019) set the framework [3]. About 4.3 lakh sq km has been mapped for landslide susceptibility, and the national inventory records about 91,000 past landslides [2].
  • Forecasting: The National Landslide Forecasting Centre (NLFC) in Kolkata has issued forecasts since 2024, based on rainfall thresholds and weather models [2][4]. Mission Mausam (₹2,000 crore) and the Bharat Forecast System, at about 6 km resolution, make warnings more local [2].
  • Early warning: Sensor-based landslide early warning systems (LEWS) track pore-water pressure and slope movement. One example is the Sikkim early warning system, co-funded by the Ministry of Earth Sciences and the state disaster management authority [2].
  • Mitigation finance: A ₹1,000-crore landslide mitigation project covers 15 states, 10 of them Himalayan. It was approved by a committee chaired by the Union Home Minister and is funded from the NDMF [1][2].

Gaps that keep the shift incomplete

  • Coarse scale: Maps at 1:50,000 cannot flag a single slope, and GSI carried out only 45 site-specific studies of chronic landslides in 2019–24 [4].
  • Limited coverage: The NLFC forecasts for only 20 districts, while mitigation funding reaches 15 states [2].
  • Weak last mile: After the 2013 disaster, CAG found that capacity building for disaster risk management in Uttarakhand had not been taken up [6]. In 2026, Parliament's Home Affairs committee sought hyper-local, multilingual alerts [5].
  • Land use unchanged: The same committee had to recommend using multi-hazard risk maps in town planning [5]. Risk maps still do not decide where people may build.

Way forward

  • Map high-risk towns and road corridors at a finer scale, and add ground sensors in the districts the NLFC already covers.
  • Make susceptibility maps a required check before building and road permits on slopes, and link NDMF funds to states adopting this rule.
  • Build a single multi-hazard early-warning platform [5] that sends alerts through sirens and panchayats in local languages.

India has begun the move from relief to risk reduction: it now measures and forecasts landslide risk, but it does not yet control where people build. If states put maps into land-use rules and strengthen last-mile response, Himalayan landslide management can meet the Sendai Framework's aims and protect lives before disaster strikes.

Sources

  1. 1Mitigation Projects under NDMF, Ministry of Home AffairsNDMF under the DM Act; landslide risk mitigation programme approved in November 2024
  2. 2PIB Press Release: Dr. Jitendra Singh at the 7th World Landslide Forum (2026)shift to prevention; mapping, inventory, NLFC, LEWS, Sikkim EWS, Mission Mausam, Bharat Forecast System, ₹1,000-crore project in 15 states
  3. 3NIDM Journal: reference to NDMA National Landslide Risk Management Strategy (2019)2019 strategy framework
  4. 4PIB parliamentary reply on GSI landslide investigations (August 2025)1:50,000 mapping, rainfall-threshold forecasting, 45 site-specific studies
  5. 5PRS Report Summary: Disaster Management (Standing Committee on Home Affairs, 2026)hyper-local multilingual alerts, risk mapping in town planning, multi-hazard early-warning platform
  6. 6CAG Report No. 2 of 2018, Chapter 5: Reconstruction of Infrastructure Post 2013 Disaster in Uttarakhandcapacity building for disaster risk management not taken up
Practice
6 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →

More from this note

More on Geography