India's infrastructure push depends on imported capital equipment. Critically examine how schemes for indigenous construction and infrastructure equipment manufacturing can strengthen supply-chain resilience.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →Public capex is budgeted at ₹12.2 lakh crore for FY2026-27 [3]. Yet India's roughly ₹1.03 lakh crore construction and infrastructure equipment (CIE) market is largely imported [2]. The Cabinet-approved ₹11,000-crore CIE scheme [1] seeks to close this gap. It is a necessary but partial answer to supply-chain risk.
How such schemes strengthen resilience
- Less dependence on a few foreign suppliers: the Ministry of Heavy Industries names supply-chain security as a goal. The scheme covers tunnel boring machines (TBMs), ship-to-shore cranes, excavators and off-highway trucks [1]. When a supplier holds back delivery, the project stops, which costs more than a higher price.
- Protects strategic assets: the scheme targets TBMs for metros and high-altitude roads [3] and cranes for ports, which are critical logistics nodes [1].
- Builds buyer trust: a dedicated CIE testing facility [1] can build on the testing and certification centres already upgraded under the Capital Goods Scheme Phase II [5].
- Much larger scale: the outlay is about nine times Phase II's ₹1,207 crore [5]. It also aims to create jobs in heavy engineering [1].
Limitations
- Money arrives late: Parliament was told ₹14,300 crore over seven years, with only ₹200 crore in year one [2]. The gap with the Cabinet figure is unexplained, which makes firms unsure about investing.
- Small next to the market: the outlay is about one-tenth of the market [2]. It can help firms enter a few high-value machines but cannot replace imports across the sector.
- Weak delivery record: Phase II had sanctioned only 32 projects worth about ₹1,364 crore [4].
- Incentives do not create orders: metro, rail and port agencies are the main buyers, and first-generation domestic machines carry cost and reliability risk.
- Very wide scope: the targets range from lifts to TBMs [3], and one incentive design may not suit both.
Way forward
- Publish year-wise phasing and give reliable domestic makers preference under the Public Procurement (Make in India) Order.
- Measure results by machines made in India and imports replaced, not by projects sanctioned.
Overall, the CIE scheme moves resilience from rhetoric to capacity. Its success will depend on assured orders, timely payouts and credible testing. Done well, it makes Atmanirbhar Bharat a safeguard for India's infrastructure push.
Sources
- 1The Hindu, "Cabinet clears scheme for manufacture of equipment" (26 Nov 2026)₹11,000-crore outlay; Ministry of Heavy Industries; equipment covered; supply-chain security and employment goals; testing facility
- 2PIB, Press Release on 332nd Parliamentary Standing Committee Report on Ministry of Heavy Industries₹1.03 lakh crore CIE market, largely imported; ₹14,300 crore over seven years; ₹200 crore in year one
- 3Union Budget 2026-27 Speech₹12.2 lakh crore capex; CIE scheme scope from lifts to TBMs for metros and high-altitude roads
- 4PIB, 32 projects (₹1,363.87 crore) sanctioned under Capital Goods Scheme Phase IIPhase II progress
- 5Ministry of Heavy Industries, Scheme for Enhancement of Competitiveness in the Indian Capital Goods Sector Phase II₹1,207-crore outlay; upgrading testing and certification centres
Practice
8 questions on this article
Check the answer for each question, or reveal all at once.