How do infrastructure projects in ecologically sensitive regions balance connectivity needs with wildlife conservation? Illustrate with examples.
In this answer
India's growth corridors increasingly cut through elephant and tiger habitats, making mitigation design — not project abandonment — the core policy tool. The balance is struck by embedding wildlife-permeable structures, route realignment and statutory clearance into project design itself, though outcomes remain uneven.
Design-level mitigation: making highways permeable
- Elevated corridors over animal crossings: the CCEA-approved 4-laning of the Kaliabor–Numaligarh section of NH-715 (85.675 km, Rs 6,957 crore) includes a 34.5 km elevated stretch covering the entire wildlife cross-movement from Kaziranga National Park to Karbi-Anglong Hills, keeping passage free even during monsoon flooding when animals flee uphill [1].
- Underpasses and bypasses: the Guwahati–Tezpur Corridor on NH-15 (135.871 km, Rs 8,970.20 crore, BOT-Toll) provides one elephant underpass in the Tezpur bypass, alongside 46 underpasses and 19 flyovers [2].
Route planning and congestion diversion
- Greenfield bypasses shift traffic away from sensitive and densely settled stretches — 21 km of bypasses at Jakhalabandha and Bokakhat near Kaziranga [1], and 5 bypasses totalling 58.7 km on the Guwahati–Tezpur corridor [2].
- Building parallel capacity reduces pressure on ecologically loaded routes: the NH-15 corridor is designed to decongest NH-27 (East-West Corridor) on the Brahmaputra's south bank [2].
Regulatory and multi-objective balancing
- Projects in eco-sensitive zones require environment and wildlife clearances, forcing mitigation as a precondition rather than an afterthought.
- Connectivity gains are simultaneously developmental: the NH-15 project serves 2 aspirational districts (Darrang, Udalguri), 8 industrial parks and tourist sites including Kaziranga and Orang National Parks [2], showing conservation and access can be co-designed.
Balance is therefore achieved less by choosing between road and habitat than by engineering continuity for both — elevated spans, underpasses and bypasses that let wildlife move under traffic. Going forward, mandatory pre-project wildlife corridor mapping, post-construction monitoring of animal usage, and standardised mitigation norms for all eco-sensitive alignments would institutionalise what is currently project-specific good practice, advancing both infrastructure goals and Article 48A's duty to protect wildlife.
Sources
- 1Cabinet approves widening and improvement of existing highway to 4 lane of Kalibor-Numaligarh section of NH-715 in Assam, PIB (2025)85.675 km, Rs 6,957 crore, 34.5 km elevated wildlife corridor, Jakhalabandha–Bokakhat bypasses
- 2Cabinet approves construction of 4 Lane Highway from Baihata Chariali near Guwahati to Tezpur along NH-15 in Assam, PIB (2026)135.871 km, Rs 8,970.20 crore, BOT-Toll, elephant underpass, bypasses, aspirational districts, NH-27 decongestion