Linear infrastructure is the single largest driver of habitat fragmentation in India. Discuss mitigation strategies with a multi-stakeholder approach.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →Linear infrastructure includes roads, railways, power lines and canals. It cuts continuous habitats into isolated patches. At its 92nd meeting (Nov 2026), the Standing Committee of the National Board for Wildlife (SC-NBWL) noted that tackling this needs planners, builders, consultants, managers, regulators, policymakers and analysts to act together [1].
Why linear infrastructure fragments habitats
- Volume of projects: The 88th SC-NBWL meeting considered 70 proposals, mainly road widening, transmission lines, mobile towers and water supply in and around Protected Areas [2]. The 92nd considered 133 [1].
- Harm to species: Great Indian Bustards die by colliding with overhead power lines. In 2021 the Supreme Court restricted overhead lines across about 99,000 sq km [3].
- Gap in the process: Projects are appraised one at a time in a single sitting. The combined damage to a whole landscape is never assessed.
Mitigation: a multi-stakeholder approach
Plan corridors → Design safely → Appraise strictly → Monitor jointly
Fig: Mitigation across the project life-cycle
- Planners and infrastructure ministries: Map routes in advance instead of approving line by line. In 2025 the Supreme Court approved designated power corridors for the Great Indian Bustard landscape [3]. The same can be done for tiger, elephant and coastal habitats.
- Builders and consultants: Follow avoid–minimise–mitigate design: reroute lines, put them underground, and build animal crossings. The Court ordered key lines put underground or rerouted [3].
- Regulators (SC-NBWL): Apply the Committee's three tests strictly: ecological impact, public welfare, adequacy of mitigation [1]. Run two tracks: quick clearance under standard conditions for small village utilities, and a deeper cumulative-impact review by WII for highways and railways.
- Policymakers: Make scrutiny more independent. A Parliamentary panel warned that committees dominated by officials could become a "rubber stamp". It sought at least one-third non-official members plus the WII Director [4]. Publish the decision on every proposal.
- Managers, frontline staff and communities: Track roadkill and maintain crossings. The SC-NBWL calls frontline staff and communities the backbone of conservation [1].
Fragmentation is a planning failure as much as an engineering one. The fix is to plan routes for whole landscapes, appraise projects scientifically and openly, and involve local people. This approach can meet development needs while upholding Article 48A, Article 51A(g) and SDG 15 (Life on Land).
Sources
- 1PIB: 92nd Meeting of the Standing Committee of NBWL, 23 Nov 2026133 proposals; multi-stakeholder approach to linear infrastructure; three appraisal tests; frontline staff and communities
- 2PIB: Union Environment Minister chairs 88th Meeting of the Standing Committee of NBWL (Jan 2026)70 proposals covering public utilities, defence and infrastructure
- 3Supreme Court of India: M.K. Ranjitsinh v. Union of India, WP(C) 838/2019 (orders of 19 Apr 2021 and 19 Dec 2025)99,000 sq km power-line restriction; undergrounding and rerouting; designated power corridors
- 4PRS Legislative Research: Standing Committee Report Summary, Wild Life (Protection) Amendment Bill, 2021"rubber stamp" warning; one-third non-official members and WII Director