·The Hindu·15 marks·250–350 words

Recent PSLV failures have raised questions about India's launch vehicle reliability. Examine the technical and strategic implications for ISRO's international partnerships.

In this answer
  1. Technical implications
  2. Strategic implications for partnerships

The PSLV, ISRO's workhorse with a long record of commercial launches, has suffered two consecutive failures — PSLV-C61 (May 2025, EOS-09) and PSLV-C62 (January 2026, EOS-N1 with 14 co-passengers) [1][2]. Both anomalies occurred in the third stage, making reliability, rather than capability, the central question for India's space partnerships.

Technical implications

  • Recurring third-stage vulnerability: C61 saw a fall in chamber pressure in the solid third-stage motor; C62 saw a higher roll-rate disturbance and flight-path deviation [1][2]. A repeat failure in the same stage points to a systemic issue in the PS3 segment, not random chance.
  • Quality assurance and review: ISRO constituted a Failure Analysis Committee after C61 [1], yet a second loss within months suggests corrective action must extend to design margins, batch-level propellant checks and instrumentation.
  • Payload and schedule cost: loss of Earth-observation assets and commercial co-passengers disrupts the EOS series and crowds an already dense manifest.

Strategic implications for partnerships

  • Confidence, largely retained: France's CNES has publicly reaffirmed trust in ISRO and in the PSLV as launcher for the joint TRISHNA thermal-infrared mission, planned for 2027 [3][6] — evidence that a long partnership is judged on cumulative record, not two flights.
  • Institutional depth cushions setbacks: ISRO–CNES cooperation, spanning Megha-Tropiques and SARAL-AltiKa, and the India–France Joint Statement's commitment to deeper space-industry collaboration and sovereign access to space, give the relationship strategic ballast [4][5].
  • Commercial exposure: for newer customers routed through NSIL/IN-SPACe, insurance costs and slot confidence are more fragile than for treaty-level partners.

Reliability is thus a manageable technical problem set against a resilient diplomatic base. A transparent failure-analysis regime, independent design review of the third stage and a successful demonstration flight before TRISHNA would convert this setback into strengthened credibility — sustaining India's role as a trusted partner in global climate and Earth-observation science.

Sources

  1. 1All India Radio — ISRO forms probe panel after PSLV-C61 glitch leaves EOS-09 off targetMay 2025 failure, third-stage chamber pressure drop, failure committee
  2. 2All India Radio — PSLV-C62 anomaly: ISRO investigates roll disturbance during third stage of EOS-N1 missionJanuary 2026 failure, roll-rate disturbance, 14 co-passenger satellites
  3. 3CNES — TRISHNA mission project pageISRO–CNES joint thermal-infrared mission, 2027 launch, 5-year life
  4. 4PIB — Parliament Question: ISRO's collaboration with other space agenciesTRISHNA as a joint ISRO–CNES mission; earlier Megha-Tropiques and SARAL cooperation
  5. 5PIB — India–France Joint StatementCNES–ISRO partnership, space-industry collaboration, sovereign access to space
  6. 6The Hindu — "Have complete trust in ISRO": French space agencyCNES reaffirming confidence in ISRO and PSLV for TRISHNA despite the two failures

More from this note