The Central Secretariat Library (CSL) is 135 years old and holds about 8.5 lakh volumes. It is the second-largest Central Government library, after the National Library in Kolkata [1]. In September 2026 it was told to vacate Shastri Bhawan for the Central Vista project, and no new space had been marked out for it [1]. The case shows that modernisation and heritage can conflict when planning is badly sequenced. They need not conflict by nature.
Case for infrastructure modernisation
- Consolidation and efficiency: Central Vista replaces old, scattered buildings with integrated offices for ministries [3].
- Prime land use: Ageing buildings like Shastri Bhawan are costly to maintain. Modern buildings improve safety, energy use and coordination.
- Digital shift: Many newer government documents are online, so the library's need for physical space may fall over time.
Concerns for institutional heritage
- Institutional memory: CSL began as the Imperial Secretariat Library in Kolkata in 1891. It holds official reports and documents used by all ministries [2]. Most older material has not been digitised.
- Planning-sequence failure: CPWD gave 13 days' notice (September 17 to 30) and treated the library like an ordinary office [1].
- Selective safeguards: The government's Central Vista document promised to preserve collections of the National Museum, National Archives and IGNCA. CSL was not named [3].
- Coordination gap: MoHUA and CPWD control the buildings, but the Ministry of Culture runs the library [1][2].
- Accountability: The Supreme Court took suo motu cognisance and sought a detailed affidavit on the relocation [1]. The executive had acted before it had a plan.
Reconciling the two
- Space before shifting: Publish the allotted area and layout plan before any vacate notice is issued.
- Interim custody: Provide a temporary building with shelving and climate control, not boxes in storage.
- Digitise first: Fund the scanning of rare holdings under the National Mission on Libraries. Its ₹400 crore outlay includes the National Virtual Library of India [4].
- Audit the collection: The Ministry of Culture should list rare, fragile and print-only items to work out how much space is really needed.
Modernisation and heritage can work together if the order is right: plan, digitise, then relocate. A heritage-impact protocol for every public institution displaced by redevelopment would make Central Vista match the constitutional duty under Article 51A(f) to value and preserve India's composite heritage.
Sources
- 1The Hindu, "Why is the Central Secretariat Library being shifted?" (24 Nov 2026)135-year history, 8.5 lakh volumes, second-largest library, vacate notice of Sept 17 with Sept 30 deadline, no space marked, CPWD order, SC suo motu action and affidavit, Ministry of Culture control
- 2Central Secretariat Library, Ministry of Culture (Indian Culture portal)origin as Imperial Secretariat Library (1891), official-document collection serving ministries, run by the Ministry of Culture
- 3Central Vista Project, MoHUA — PIB document (Nov 2022)office consolidation aims; preservation promise limited to National Museum, National Archives and IGNCA
- 4National Mission on Libraries, Ministry of Culture₹400 crore outlay; National Virtual Library of India component