·The Hindu·15 marks·250–350 words

Trace the evolution of India's submarine arm from import dependence to indigenous construction. What gaps remain?

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Evolution: From Import to Indigenous Construction
  2. Gaps That Remain

In 1976, The Hindu called the Russian-made INS Karanj, a diesel-electric boat that ran on batteries underwater, part of "perhaps the most powerful arm of the Indian Navy" [1]. Fifty years later, a new Karanj has been built in Mumbai. India has moved from buying submarines to building them, but it does not yet design them.

Evolution: From Import to Indigenous Construction

  • Import phase: The early fleet was made up of Soviet Foxtrot-class boats bought ready-made. The first Karanj served until 2003 [2].
  • Long-term planning: In 1999 the CCS approved a 30-year submarine-building plan, with 12 new boats due by 2012 [3].
  • Build-in-India phase: Under Project-75, Mazagon Dock (MDL) built six Scorpenes in collaboration with France's Naval Group [2]. INS Kalvari joined in December 2017 [4] and the sixth boat in January 2025 [5].
  • Indigenous technology: DRDO's fuel-cell AIP makes its hydrogen on board. It has passed land-based trials and is due to be fitted to Kalvari-class boats during refits [6].

Import (Soviet Foxtrots) → 1999 plan → Licensed build (P-75, MDL) → Indigenous AIP/design (pending)

Gaps That Remain

  • Timeline slippage: By 2016-17, not one boat from the 1999 plan had been inducted [3]. The last Scorpene arrived 13 years after the 2012 target [5].
  • Ageing fleet and force-level gap: In 2017-18 the Navy had 14 conventional boats plus one leased, aged 17–31 years. The goal was 18 conventional and 6 nuclear-powered submarines [4]. Old boats spend longer in refit, so fewer are ready to deploy.
  • Design dependence: Even DRDO's own AIP needs Naval Group certification before it can be fitted [6]. P-75I is reportedly moving to a German design, which would be a third foreign partner with new training and supply chains [7].
  • Endurance limit: AIP is not yet at sea. DRDO's energy modules and the "AIP plug" (the extra hull section that holds the system) are still in development [8]. The Scorpenes in service therefore face the same battery limit described in 1976 [1].

India has moved from buying submarines to building them at home, but its own design capability, timely delivery and underwater endurance are still incomplete. The way forward is a committed indigenous design programme, time-bound AIP fitment and a steady order-book for shipyards. Together these would turn "Make in India" into "Design in India", close the force-level gap flagged by the Standing Committee [4] and secure India's sea-denial role in the Indian Ocean.

Sources

  1. 1The Hindu, "Indian Navy Submarine in Madras", Fifty Years Ago, 30 Oct 20261976 Karanj Russian-made, diesel-electric/battery propulsion, "most powerful arm"
  2. 2Indian Navy, "INS Karanj – Third Kalvari Class Submarine Commissioned at Naval Dockyard, Mumbai" (2021)Foxtrot-class predecessor decommissioned 2003; built by MDL in collaboration with Naval Group
  3. 3Standing Committee on Defence (2016-17), 16th Lok Sabha, 25th Report1999 CCS 30-year plan; 12 boats by 2012; none inducted
  4. 4Standing Committee on Defence (2017-18), 16th Lok Sabha, 41st Report14+1 boats aged 17–31 years; 18 conventional + 6 nuclear goal; Kalvari commissioned Dec 2017
  5. 5PRS Legislative Research, Demand for Grants 2025-26 Analysis: Defencesixth Scorpene commissioned January 2025
  6. 6PIB, "Aatmanirbhar Bharat: DRDO's Fuel Cell-based AIP system to soon be fitted onboard INS Kalvari"on-board hydrogen generation; land trials; refit fitment; Naval Group certification
  7. 7DRDO News Paper Clippings, 14 October 2025reported shift to German-designed P-75I at MDL
  8. 8DRDO, Air Independent Propulsion (AIP) Systemenergy modules and AIP plug still under development

More from this note