In this answer
  1. Components of transit access
  2. How it builds trust
  3. Limits that weaken the tool

For landlocked Nepal, transit is a lifeline. Its routes to the sea, its fuel and its markets run almost entirely through India, which accounts for over 60% of Nepal's goods trade [2]. Transit access can therefore build strategic trust. But it builds trust only when it is reliable and actually delivered.

Components of transit access

  • Ports: Nepal's transit cargo can now use the Deendayal (Kandla) and Paradip ports, which spreads its routes across both Indian coasts [1].
  • Pipelines: MAPL Phase II was dedicated and the foundation stone of the Jhapa terminal was laid, which secures Nepal's fuel supply [1].
  • Border and rail: a new Banbasa ICP, the Dharchula–Darchula bridge and the Ayodhya–Janakpur Sarayu-Kamala Express [1].
  • Power transit: Nepal already sells electricity to Bangladesh through the Indian grid [2].

How it builds trust

  • Interdependence: India buys over 80% of Nepal's exports and about 1,100 MW of its power [2]. Both sides therefore gain from stability.
  • Strategic positioning: combined with the Rs 15,000 crore development package [1], transit makes India Nepal's natural partner under Neighbourhood First.
  • Institutionalisation: access written into agreements is harder to withdraw. More than 40 bilateral mechanisms support it [2].

Limits that weaken the tool

  • Asymmetric dependence: every new route still passes through India, so Kathmandu may see connectivity as leverage rather than goodwill.
  • Delivery deficit: Banbasa ICP, Lower Arun and the Jhapa terminal are still only foundation stones. Raxaul–Kathmandu rail is at survey stage [1]. The CAG found the Indo-Nepal Border Road only 29% complete by March 2021, five years past its deadline, with ₹831 crore in cost overruns [3].
  • Infrastructure gaps: Muzaffarpur–Dhalkebar is the only operational high-capacity power line between the two countries [2].

Taken together, these parts show that trust comes from access that is predictable, delivered on time and widens Nepal's choices, not from access alone. The Standing Committee on External Affairs called for fixed timelines and regular monitoring of neighbourhood projects [4]. Following that advice, publishing a project tracker and making power routes through BBIN/BIMSTEC permanent would turn geography into goodwill, in the spirit of the 1950 Treaty of Peace and Friendship [2].

Sources

  1. 1PIB/PMO: List of Outcomes, State Visit of the Prime Minister of Nepal to India (23 Nov 2026)new ports, MAPL-II, Jhapa terminal, Banbasa ICP, Dharchula–Darchula bridge, Sarayu-Kamala Express, Rs 15,000 crore package, Raxaul–Kathmandu survey stage
  2. 2MEA: India–Nepal Bilateral Relations brieftrade and export shares, 1,100 MW power exports, power sales to Bangladesh, 40+ mechanisms, Muzaffarpur–Dhalkebar line, 1950 Treaty
  3. 3CAG Report No. 23 of 2021: Performance Audit of the Indo-Nepal Border Road Project (press brief)29% completion by March 2021, ₹831.30 crore overrun
  4. 4PRS Report Summary: India's Neighbourhood First Policy (Standing Committee on External Affairs, 2023)fixed timelines and monitoring for neighbourhood projects