  1. How the reforms raise speed
  2. Where quality can slip
  3. Safeguards for verifiable trust

Trust-based regulation replaces routine prior approval with accredited self-certification and checks after the fact. The Ministry of Coal's Mineral Concession (Third Amendment) Rules, 2026 extend the accreditation of Accredited Prospecting Agencies (APAs) and Mining Plan Preparing Agencies (MPPAs) from three to five years [1]. The reform clearly adds speed. Whether quality holds depends on the safeguards built around it.

How the reforms raise speed

  • Longer accreditation: fewer re-assessments and lower compliance costs. It also avoids lapses midway through the geological report and mining plan work that every coal or lignite block needs before it can start mining [1].
  • Wider agency pool: 18 private APAs accredited by QCI-NABET (the Quality Council of India's accreditation board) were notified in November 2025. The ministry expected this to save about six months compared with the prospecting-licence route [2].
  • Peer review instead of state approval: a geological report peer-reviewed by another APA no longer needs approval from the Ministry's committee, saving at least three months [3].
  • Digitisation: an exploration module added to the Single Window Clearance System (SWCS) in July 2025 handles geological report approvals online [4]. Mining-plan approval time fell to about 4.5 months from 9–12 months [5].

Where quality can slip

  • Fewer checks on both sides at once: the state no longer reviews each report, and agencies are now re-accredited less often [1][3].
  • Weak peer review: the private pool is small. Today's reviewer may be reviewed by the same firm tomorrow, so neither has much reason to be strict.
  • Past record: the CAG found that dossiers for nine auctioned coal mines had no approved mine closure plans. The Ministry blamed time pressure [6], which is the same speed-versus-quality trade-off.
  • Speed gains overstated: a Parliamentary Standing Committee linked incomplete exploration to delays in permission for drilling in forest areas [7]. Longer accreditation does nothing about these.

Safeguards for verifiable trust

  • Base renewal on track record, using SWCS data on how often an agency's reports were rejected or revised [4].
  • Have CMPDIL (Coal India's planning arm) re-check a random sample of peer-reviewed reports each year.
  • Rotate peer-review pairs, and publish who reviewed which report and any suspensions.
  • Require every mining plan to carry an updated closure plan, with closure escrow linked to actual output.

Trust-based reforms have speeded up coal block operationalisation, but they protect quality only if they are paired with audits of outcomes. A "trust but verify" approach can serve energy security and responsible mining under SDG 12 together, and Parliament should review the results after the first five-year cycle.

Sources

  1. 1Ministry of Coal amends Mineral Concession Rules, 1960, extends accreditation of APAs and MPPAs from three to five years (PIB)3→5 year accreditation; reports and plans needed before operationalisation
  2. 2PIB release on notification of 18 Accredited Prospecting Agencies, Ministry of Coal (Nov 2025)18 QCI-NABET APAs; ~6 months saved
  3. 3Ministry of Coal introduces Simplified Approval Mechanism for Exploration Programs and Geological Reports (PIB, Dec 2025)peer-reviewed reports need no committee approval; ≥3 months saved
  4. 4Coal Ministry holds workshop on Exploration Module of SWCS (PIB, July 2025)online approval of geological reports
  5. 5Standing Committee on Coal, Mines and Steel (2025-26), 15th Report, 18th Lok Sabhamining-plan approval ~4.5 months vs 9–12 months
  6. 6CAG Report No. 20 of 2016: e-Auction of Coal Minesnine mine dossiers without approved closure plans
  7. 7Standing Committee on Coal, Mines and Steel (2022-23), 38th Report, 17th Lok Sabhaincomplete exploration; forest-area drilling permission delays