  1. Uniform buffers: strengths
  2. Uniform buffers: weaknesses
  3. Site-specific ZoI: strengths
  4. Site-specific ZoI: weaknesses
  5. Verdict and way forward

The Pallikaranai marsh in Chennai is a Ramsar site of about 1,247.5 ha [2], and it shows the dilemma clearly. The NGT imposed a 1-km construction ban around the marsh. The Tamil Nadu State Wetlands Authority (TNSWA) now proposes an interim Zone of Influence (ZoI) of only 128.19 ha across 36 survey numbers [1]. In principle, the site-specific approach is better. In practice, it works only when science and deadlines back it.

Uniform buffers: strengths

  • Precautionary certainty: a uniform buffer is simple to enforce and hard to dilute, in line with Articles 21 and 48A.
  • Immediate protection where data is lacking: the NGT's 1-km ring froze construction at Pallikaranai's edges [1]. The Supreme Court's 2022 directions on a 1-km Eco-Sensitive Zone around protected areas followed the same logic.

Uniform buffers: weaknesses

  • Ecologically blunt: water moves along channels and low ground, not in circles. The marsh is hydrologically linked to about 54 satellite water bodies [2].
  • Economic freeze: a blanket ring also restricts lawful private land with no water link to the wetland. Builders such as CREDAI-Chennai have challenged it through writ petitions [1].

Site-specific ZoI: strengths

  • Statutory design: the Wetlands (Conservation and Management) Rules, 2017 require each wetland's zone of influence to be delineated, with activities prohibited or regulated within it [3].
  • Function-based: a site-specific zone can protect what matters most, such as the marsh's role as a "sponge" and aquatic buffer for flood-prone Chennai [2].
  • Planning clarity: maps at the survey-number level let the CMDA build the line into its master plans.

Site-specific ZoI: weaknesses

  • Evidence gap: the High Court admits that a final ZoI needs "elaborate studies" [1], yet the site has been designated since April 2022 [2].
  • Risk of capture: the interim zone is about one-tenth of the site's area, and the petitioners call it "completely acceptable" [1]. Agreement among the parties does not prove ecological adequacy.
  • Fragmentation: 36 scattered plots may leave the marsh's inflow channels exposed.

Verdict and way forward

  • Prefer the site-specific ZoI, but set a time-bound final ZoI and publish how the zone is drawn.
  • Keep the uniform buffer as the default until the ZoI is notified.
  • Back the ZoI with sewage control and an Integrated Management Plan under the NPCA.

A uniform buffer gives certainty without precision; a site-specific ZoI gives precision only when it rests on evidence. Hydrology-based, time-bound ZoIs that are written into master plans can serve both Article 48A and SDG 11 and SDG 15. They would let Indian cities grow without paving over their wetlands.

Sources

  1. 1Madras High Court adjourns Pallikaranai interim Zone of Influence case to November 11, The Hindu (Chennai), 15 October 2026NGT's 1-km ban, TNSWA's interim ZoI (128.19 ha, 36 survey numbers), CREDAI-Chennai petitions, need for "elaborate studies", petitioners' acceptance
  2. 2Ramsar Information Sheet: Pallikaranai Marsh Reserve Forest (Site no. 2481), hosted by the Tamil Nadu State Wetland Authorityarea of 1,247.54 ha, designated 8 April 2022, sponge and aquatic-buffer role, about 54 satellite water bodies
  3. 3Wetlands (Conservation and Management) Rules, 2017, MoEFCC compendium hosted by the Tamil Nadu State Wetland Authoritydelineation of wetlands and their zone of influence; prohibited and regulated activities