  1. Scope of the JV route
  2. Limits of the JV route

The Lok Sabha Estimates Committee (2018) was told that only 40% of India's defence production was indigenous and 60% was imported [2]. BrahMos is a supersonic cruise missile jointly developed by DRDO and Russia's NPOM [1]. It shows that a joint venture (JV) can give India advanced capability quickly. It also shows that full self-reliance needs more than co-production.

Scope of the JV route

  • Fast access to technology: the JV gave India one universal missile that can be launched from land, sea and air [1]. This avoided decades of solo development.
  • A path to Indian subsystems: BrahMos has been test-fired with an indigenous seeker developed by DRDO and BrahMos Aerospace [3], and with major indigenous systems [4].
  • Building an industrial base: in October 2026 the MoD signed a ₹661.50-crore contract for naval fire control systems and launchers. It falls under Buy (Indian-IDDM) and requires at least 68% indigenous content, MSME participation and jobs over three years [5].
  • Strategic value: a single missile family serves all three services, and the programme deepens the long-standing India–Russia technology partnership [1].

Limits of the JV route

  • Shared ownership of the design: a JV has two owners [1]. Replacing Russian parts with Indian ones needs the partner's consent, so it moves more slowly than indigenising a fully Indian design.
  • Headline figures overstate self-reliance: the 68% applies to launchers and fire control, not to the missile itself. Up to 32% may still be imported, and its source is not disclosed [5]. One blocked critical component could stall the whole system.
  • Tests are not production: a part tested successfully, such as the seeker [3], counts towards self-reliance only once it is fitted on every missile in series production.
  • Small scale against the overall gap: one contract barely affects the 60% import dependence. The Committee also flagged DPSU delivery lags and weak long-term vendor agreements [2].

Overall, BrahMos shows that a JV is a good starting point for self-reliance but not the finish line. The MoD should publish the indigenous-content and MSME share of each contract. It should also offer multi-year agreements to domestic vendors, as the Estimates Committee urged [2], and move tested subsystems into production. Together these steps can turn co-production into genuine Aatmanirbharta in defence.

Sources

  1. 1BrahMos — DRDO product pageDRDO–NPOM joint development; launchable from land, sea and air
  2. 2PRS Report Summary: Preparedness of Armed Forces – Defence Production and Procurement (Lok Sabha Estimates Committee, 2018)40% indigenous / 60% imported; DPSU delivery lags; long-term vendor agreement problems
  3. 3PIB: Successful Test Firing of Brahmos with Indigenous Seekerindigenous seeker developed by DRDO and BrahMos Aerospace and flight-tested
  4. 4PIB: BRAHMOS Supersonic Cruise Missile, with major indigenous systems, successfully test-firedtest firing with major indigenous systems
  5. 5The Hindu: "Govt. inks pact with BrahMos Aerospace" (7 Oct 2026, news report)₹661.50-crore contract for fire control systems and launchers; Buy (Indian-IDDM); at least 68% indigenous content; MSMEs and jobs over three years