1. At a Glance

  • Green India Mission (GIM) is one of eight missions under India's National Action Plan on Climate Change (NAPCC), aimed at protecting, restoring and enhancing forest cover [1].
  • A CAG audit (tabled 2026) covering 2015-16 to 2024-25 across 16 States/UTs found massive shortfalls against GIM's core targets, weak inter-scheme convergence, and poor fund utilisation [1][2].
  • Relevant for Prelims (NAPCC missions, implementing ministry) and Mains GS-III (environment/conservation) and GS-II (governance/accountability of CAG) [1].

2. Why in the News

  • CAG's audit report, released around 15-16 August 2026, flagged that GIM improved forest cover quality on only 0.11384 million hectares against a target of 1.4 million hectares (a 91.87% shortfall), and increased forest cover on only 0.03409 million hectares against the same 1.4 million hectare target (a 97.57% shortfall) [1].
  • The audit also found inadequate funding, weak coordination between government schemes, poor monitoring, and inconsistent use of bottom-up, local-level vulnerability assessment for site selection [1][3].

3. Background & Evolution

  • GIM was launched in 2014 by the Union Ministry of Environment, Forest and Climate Change (MoEFCC) [1].
  • It is one of eight missions under the NAPCC, launched in 2008, alongside missions like National Solar Mission, National Water Mission, etc. [1].
  • Overall mission targets: increase forest/tree cover over 5 million hectares (mha) and improve quality of forest cover on another 5 mha — a combined 10 mha target [2].
  • As of December 2025, only about 0.17 mha of plantation activity had been undertaken since 2015-16 [2].
  • GIM builds on/absorbs earlier afforestation programmes such as the National Afforestation Programme [1].

4. Core Static Facts

Parameter Detail
Launch year 2014 [1]
Nodal Ministry Ministry of Environment, Forest and Climate Change (MoEFCC) [1]
Parent framework National Action Plan on Climate Change (NAPCC), 2008 — one of 8 missions [1]
Audit period examined 2015-16 to 2024-25 [1]
States/UTs audited 16 [1]
Target: quality improvement of forest cover 1.4 mha (achieved: 0.11384 mha; shortfall 91.87%) [1]
Target: increase in forest cover 1.4 mha (achieved: 0.03409 mha; shortfall 97.57%) [1]
Overall mission-level target 10 mha (5 mha new cover + 5 mha quality improvement) [2]
Fund utilisation (RE 2025-26) Only ~28% of allocated budget utilised [2]
Budget allocation shortfall (2022-23) Ministry sought ₹646 crore, got ₹317 crore (51% shortfall) [2]
Livelihood target ~3 million forest-dependent households [2]

5. Multi-Dimensional Analysis

Environmental

  • GIM is central to India's carbon sink commitments under its NDCs (creating an additional carbon sink of 2.5-3 billion tonnes of CO2 equivalent by 2030 is an NAPCC-linked goal) [1].
  • Its objectives include improving ecosystem services — biodiversity, water, and carbon sequestration [1].

Administrative

  • CAG flagged weak coordination/convergence with other central and state schemes, diluting on-ground impact [1].
  • Poor monitoring mechanisms meant deviations from targets went uncorrected over nearly a decade [1].
  • Site selection did not consistently follow a bottom-up, local vulnerability assessment; some low-vulnerability areas were picked over high-risk ones [3].

Economic

  • Persistent underutilisation of funds since 2020-21, with utilisation falling to ~28% in RE 2025-26, reflects both budgetary constraint and implementation weakness [2].
  • Budgetary allocations have consistently trailed ministry demands (e.g., 51% shortfall in 2022-23) [2].

Social

  • Livelihood objective (targeting ~3 million forest-dependent households) risks being undermined if plantation and quality-improvement targets are missed [2].

Governance/Ethical

  • CAG's role as a constitutional auditor (Article 148) surfacing implementation failures underscores accountability gaps in flagship climate schemes [1].

6. Recent Developments (last 12-18 months)

  • August 2026: CAG audit report on GIM implementation (2015-16 to 2024-25) tabled, revealing 91.87% and 97.57% shortfalls in quality-improvement and forest-cover-increase targets respectively [1].
  • 2025-26 RE: Fund utilisation under climate-change-related MoEFCC schemes including GIM stood at ~27-28% [2].
  • Prior state-level CAG findings (e.g., Madhya Pradesh, 2023) found afforestation survival rates ranging 6%-62% across sites, and ₹53 crore spent on activities not linked to compensatory afforestation [2].

7. Prelims Hooks

  • GIM was launched in 2014 by MoEFCC [1].
  • GIM is one of eight missions under the NAPCC (2008) [1].
  • CAG's GIM audit covered 16 States/UTs over 2015-16 to 2024-25 [1].
  • Target for improving quality of forest cover: 1.4 mha; actual achievement: 0.11384 mha (shortfall 91.87%) [1].
  • Target for increasing forest cover: 1.4 mha; actual achievement: 0.03409 mha (shortfall 97.57%) [1].
  • Overall GIM target: 5 mha new forest/tree cover + 5 mha quality improvement = 10 mha [2].
  • Fund utilisation under GIM in RE 2025-26: only ~28% [2].
  • 2022-23 budget: MoEFCC sought ₹646 crore, received only ₹317 crore (51% shortfall) [2].
  • A CAG audit in Madhya Pradesh (2023) found afforestation survival rates between 6% and 62% [2].
  • GIM aims to create additional livelihood opportunities for about 3 million forest-dependent households [2].
  • Implementing/nodal ministry: MoEFCC (not Ministry of Rural Development or Ministry of Tribal Affairs — common distractor) [1].

8. Mains Relevance

9. Related Topics to Study Next

  • National Action Plan on Climate Change (NAPCC) — GIM's parent framework; understand all 8 missions.
  • National Afforestation Programme (NAP) — predecessor/related scheme with overlapping objectives.
  • Compensatory Afforestation Fund Management and Planning Authority (CAMPA) — related funding mechanism for afforestation.
  • India's NDCs and carbon sink target — GIM contributes to the 2.5-3 billion tonne CO2 sink commitment.
  • Comptroller and Auditor General (Article 148-151) — institutional mechanism behind this audit.
  • India State of Forest Report (ISFR) — data source for tracking actual forest cover changes.
  • Van Dhan Yojana / Forest Rights Act, 2006 — related forest-livelihood and tenurial rights frameworks.

10. Common Errors / Trap Areas

  • Confusing GIM's nodal ministry (MoEFCC) with Ministry of Rural Development or Tribal Affairs.
  • Mixing up GIM's launch year (2014) with the NAPCC's launch year (2008).
  • Conflating the 1.4 mha audit-period targets with the overall 10 mha (5+5) mission-level target — these are different scales/timeframes.
  • Assuming CAG audits are Ministry-specific policy critiques rather than performance/compliance audits of implementation against stated targets.
  • Confusing GIM with the National Afforestation Programme (NAP), which is a related but distinct, older scheme.

Sources

  1. 1CAG audit highlights major gaps in Green India Mission — The Hinduthehindu.com · tier 4
  2. 2Demand for Grants 2026-27 Analysis: Environment, Forests and Climate Change — PRS Legislative Researchprsindia.org · tier 1
  3. 3Green India Mission misses forest cover target by 97.57%, CAG flags poor planning and funding gaps — NE Nownenow.in · tier 4
At the end · practice MCQs
12 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

Mains Q&A on this note

Also on 16 August

All 16 August articles →