·The Hindu

FinMin panel clears Budget proposal of ₹1.25 lakh cr. for ISM 2.0

In this note
  1. At a Glance
  2. Why in the News
  3. Background & Evolution
  4. Core Static Facts
  5. Multi-Dimensional Analysis
  6. Recent Developments (Last 12-18 Months)
  7. Prelims Hooks
  8. Mains Relevance
  9. Related Topics to Study Next
  10. Common Errors / Trap Areas
Practice
6 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

1. At a Glance

  • India Semiconductor Mission (ISM) 2.0 is the second phase of India's flagship programme to build a domestic semiconductor chip-manufacturing ecosystem, announced in Union Budget 2026-27 (February 1, 2026). [1]
  • The Expenditure Finance Committee (EFC) under the Finance Ministry has cleared a budget proposal of ₹1.25 lakh crore for ISM 2.0 — significantly higher than the ₹76,000 crore earmarked for ISM 1.0. [4]
  • ISM 2.0 signals India's strategic shift from ecosystem creation to ecosystem consolidation and global integration, covering semiconductor equipment, materials, indigenous IP, and supply chain resilience. [2]
  • Critical for UPSC: touches GS-III (science & technology, industrial policy), GS-II (government schemes), and economic geography; also intersects with geopolitics of chip supply chains.

2. Why in the News

  • July 1, 2026: The Expenditure Finance Committee (EFC) — the expenditure department under the Finance Ministry — formally cleared the ₹1.25 lakh crore budget proposal for ISM 2.0; it will now be placed before the Union Cabinet for final approval. [4]
  • The approval follows the Union Budget 2026-27 (February 1, 2026) announcement, in which Finance Minister Nirmala Sitharaman announced ISM 2.0 with an initial FY 2026-27 provision of ₹1,000 crore for industry-led research and training centres. [1][3]
  • The EFC-cleared ₹1.25 lakh crore is a multi-year total outlay, distinct from the annual Budget line item of ₹1,000 crore for FY 2026-27. [1][4]

3. Background & Evolution

  • December 2021: Cabinet approved the Semicon India Programme with a total outlay of ₹76,000 crore (ISM 1.0), administered by the Ministry of Electronics and Information Technology (MeitY). [5]
  • 2022: India Semiconductor Mission (ISM) set up as a specialised and independent business division within Digital India Corporation (DIC) under MeitY to serve as the nodal agency. [5]
  • 2023-24: Multiple semiconductor fab and ATMP (Assembly, Testing, Marking & Packaging) projects approved; Micron Technology (USA) announced a greenfield ATMP unit in Sanand, Gujarat.
  • 2024-25: PM Modi presented with the first set of Made-in-India chips, marking a milestone in domestic fabrication capacity. [6]
  • December 2025: 10 projects with total investment of ₹1.60 lakh crore approved across 6 states. [2]
  • June 2026: 12 projects worth ~₹1.64 lakh crore approved under ISM cumulatively. [2]
  • February 1, 2026: Budget 2026-27 announces ISM 2.0, marking Phase 2 of the semiconductor mission. [1]
  • July 1, 2026: EFC clears ₹1.25 lakh crore multi-year outlay for ISM 2.0. [4]

4. Core Static Facts

Parameter Detail
Programme name India Semiconductor Mission (ISM) 2.0
Nodal ministry Ministry of Electronics & IT (MeitY)
Implementing agency India Semiconductor Mission under Digital India Corporation (DIC)
ISM 1.0 total outlay ₹76,000 crore
ISM 2.0 proposed outlay (EFC cleared) ₹1.25 lakh crore (multi-year)
ISM 2.0 FY 2026-27 Budget line ₹1,000 crore (for industry-led R&D and training centres)
Incentive structure (ISM 1.0) Up to 50% fiscal support for silicon fabs, compound semiconductor fabs, ATMP units, chip design
Projects approved (as of Jun 2026) 12 projects, ~₹1.64 lakh crore investment, across 6 states
ISM 2.0 focus areas Semiconductor equipment; materials; indigenous full-stack IP; resilient supply chains
Technology node target 3-nm and 2-nm nodes on roadmap
Strategic target (2029) Design & manufacture chips for 70–75% of domestic applications
Long-term goal Top semiconductor nation globally by 2035
Approving body (current news) Expenditure Finance Committee (EFC), Finance Ministry
Next step Placement before Union Cabinet for final approval
Budget announced by FM Nirmala Sitharaman, Union Budget 2026-27 (Feb 1, 2026)

5. Multi-Dimensional Analysis

Economic

  • ₹1.25 lakh crore outlay is one of the largest single-mission industrial allocations in India's history, signalling semiconductor manufacturing as a core engine of the next phase of economic growth. [4]
  • ISM projects are expected to generate high-skilled employment across fab, ATMP, equipment, and design segments.
  • Domestic chip production reduces India's import dependence — India currently imports nearly all its semiconductors (annual import bill ~$24–27 billion).
  • ISM 2.0's focus on equipment and materials is intended to deepen local value-add beyond pure assembly/testing.

Geopolitical / Strategic

  • Semiconductor self-reliance is a national security imperative: chips underpin defence systems, telecommunications, EVs, AI infrastructure, and critical digital infrastructure. [2]
  • India's semiconductor push is aligned with global supply-chain de-risking from China, making India an attractive alternative hub for US, Japan, EU, and Taiwan-origin companies.
  • ISM 2.0's emphasis on resilient supply chains directly addresses vulnerabilities exposed during the 2020-22 global chip shortage. [2]
  • Ties in with India's bilateral semiconductor MoUs with the USA (iCET), Japan, and the EU.

Scientific / Technological

  • ISM 2.0 targets full-stack indigenous semiconductor IP — from chip design (EDA tools, IP cores) to fabrication and ATMP. [2]
  • Roadmap includes achieving 3-nm and 2-nm technology nodes, comparable to TSMC's frontier fabs. [2]
  • India's IIT-based chip design centres and proposed industry-led R&D and training centres (funded under the ₹1,000 crore FY26-27 provision) are foundational. [1]
  • First Made-in-India chips (presented to PM Modi) demonstrate early fabrication capability under ISM 1.0. [6]

Administrative / Governance

  • The EFC clearance is a mandatory step for large central sector scheme proposals before Cabinet approval — its clearing signals fiscal due diligence is complete. [4]
  • ISM operates as an independent business division within DIC, insulated from routine MeitY bureaucracy, to enable fast decision-making.
  • Multi-ministry coordination required: MeitY (lead), MoF, Ministry of Commerce (SEZs, trade), Ministry of Science (R&D), and state governments (land, power, water for fabs).

Historical

  • India's first semiconductor fab attempt was Semiconductor Complex Ltd (SCL), Chandigarh, established 1983-84 under the Ministry of Electronics — damaged by fire in 1989, never fully recovered.
  • ISM 1.0 (2021) represented India's second major attempt at a semiconductor ecosystem, this time with private sector partnership and larger fiscal incentives.
  • ISM 2.0 consolidates gains and pushes into equipment and materials — a trajectory mirroring South Korea's (DRAM) and Taiwan's (TSMC) historical industrial policy arcs.

6. Recent Developments (Last 12-18 Months)

  • December 2025: 10 semiconductor projects worth ₹1.60 lakh crore approved across 6 states, spanning silicon fabs, SiC fabs, advanced packaging, and ATMP units. [2]
  • February 1, 2026: FM Sitharaman announces ISM 2.0 in Union Budget 2026-27; ₹1,000 crore provisioned for FY 2026-27 for industry-led research and training. [1][3]
  • February 2026: PIB notes ISM 2.0 will focus on semiconductor equipment, materials, indigenous IP, and supply chains — marking a strategic evolution from ISM 1.0's fab/ATMP focus. [2]
  • June 2026: Total approved projects under ISM reach 12 projects, ~₹1.64 lakh crore. [2]
  • July 1, 2026: EFC clears ₹1.25 lakh crore multi-year outlay for ISM 2.0; proposal to proceed to Union Cabinet. [4]

7. Prelims Hooks

  • ISM 2.0 was announced in Union Budget 2026-27 by Finance Minister Nirmala Sitharaman. [1]
  • The Expenditure Finance Committee (EFC) — under the Finance Ministry's expenditure department — cleared the ₹1.25 lakh crore outlay for ISM 2.0 in July 2026. [4]
  • ISM 2.0 outlay of ₹1.25 lakh crore is higher than ISM 1.0's ₹76,000 crore — not lower. [4]
  • Implementing agency for ISM is the India Semiconductor Mission, a division of Digital India Corporation (DIC) under MeitY. [5]
  • ISM 1.0 offered fiscal support of up to 50% for silicon fabs, compound semiconductor fabs, ATMP units, and chip design entities. [1]
  • As of June 2026, 12 projects worth ~₹1.64 lakh crore have been approved under ISM. [2]
  • ISM 2.0 target: India capable of designing/manufacturing chips for 70–75% of domestic applications by 2029. [2]
  • ISM 2.0 shifts focus to semiconductor equipment, materials, and indigenous IP — beyond the fab/ATMP focus of ISM 1.0. [2]
  • India's first semiconductor fab: Semiconductor Complex Ltd (SCL), Chandigarh, established 1983-84. [historical]
  • ISM 2.0's FY 2026-27 annual Budget line is ₹1,000 crore (for industry-led R&D/training); the EFC-cleared ₹1.25 lakh crore is the total multi-year programme outlay. [1][4]
  • After EFC clearance, the proposal must be placed before the Union Cabinet for final approval. [4]
  • Long-term goal: India to be among top semiconductor nations globally by 2035. [2]

8. Mains Relevance

GS Papers & Syllabus Headings:

  • GS-III: Indian Economy — Industrial policy, infrastructure, science & technology, indigenisation of technology
  • GS-II: Government policies and interventions for development in various sectors; bilateral/multilateral groupings involving India
  • GS-III: Awareness in IT, Space, Computers, Robotics, Nano-technology, Bio-technology; IP rights

Plausible Mains Question Stems:

  1. India Semiconductor Mission 2.0 represents a strategic shift from ecosystem creation to ecosystem consolidation. Critically examine the significance of this shift and the challenges India faces in achieving semiconductor self-reliance. (GS-III, 15 marks)
  2. In the context of global semiconductor supply chain realignment, evaluate how India's semiconductor policy (ISM 1.0 and 2.0) serves both economic and national security objectives. (GS-III / GS-II, 15 marks)
  3. Analyse the role of the Expenditure Finance Committee in India's public financial management and its significance in clearing large scheme proposals like ISM 2.0. (GS-II, 10 marks)

9. Related Topics to Study Next

Topic Connection
Semcon India / India Electronics Policy 2019 Policy precursor to ISM; sets industrial electronics targets
iCET (Initiative on Critical and Emerging Technologies) India-USA framework covering semiconductors, AI, quantum — ISM 2.0 is partly a response to iCET commitments
Digital India Corporation (DIC) ISM's parent body; also administers UMANG, DigiLocker — understand its mandate
Production Linked Incentive (PLI) Schemes ISM uses a PLI-style incentive structure; compare with PLI for electronics, pharma, solar
Semiconductor Complex Ltd (SCL), Chandigarh India's first fab (1983); historical precedent and cautionary tale
Global Chip Supply Chain & CHIPS Acts USA CHIPS Act, EU Chips Act, Japan semiconductor push — context for India's positioning
Critical Minerals Mission Semiconductor fabrication requires gallium, germanium, rare earths — links to critical minerals policy
Expenditure Finance Committee (EFC) The body that cleared ISM 2.0; understand its composition and role in public finance

10. Common Errors / Trap Areas

  1. Confusing ₹1.25 lakh crore with ₹1,000 crore: The ₹1,000 crore is the annual FY 2026-27 Budget provision; ₹1.25 lakh crore is the total multi-year EFC-cleared outlay — these are different figures cited in the same news cycle.
  2. Wrong ministry: ISM is under MeitY, not the Ministry of Science & Technology or the Ministry of Commerce. Confusing with DST or DPIIT is common.
  3. ISM 1.0 outlay: ISM 1.0 was ₹76,000 crore, not ₹10,000 crore or ₹1 lakh crore — the number is frequently jumbled in MCQs.
  4. Implementing agency confusion: The mission is administered by India Semiconductor Mission under Digital India Corporationnot directly by MeitY's secretary, NASSCOM, or NITI Aayog.
  5. ISM 2.0 focus area confusion: ISM 2.0 focuses on equipment, materials, and indigenous IPnot primarily on new fab approvals (that was ISM 1.0's thrust). Mistaking scope leads to wrong answers in concept-based MCQs.

Sources

  1. 1"Budget 2026-27 announces the launch of India Semiconductor Mission (ISM) 2.0"pib.gov.in · tier 1
  2. 2"India Semiconductor Mission 2.0" (PIB detailed factsheet)pib.gov.in · tier 1
  3. 3"Budget 2026-2027 Speech of Nirmala Sitharaman, Minister of Finance"indiabudget.gov.in · tier 1
  4. 4"FinMin panel clears Budget proposal of ₹1.25 lakh cr. for ISM 2.0" — [primary article, PTI dateline July 1, 2026]thehindu.com · tier 4
  5. 5"India Semiconductor Mission" (PIB, 2022)pib.gov.in · tier 1
  6. 6"PM Modi presented with first set of Made-in-India Chips"pib.gov.in · tier 1
At the end · practice MCQs
6 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

Mains Q&A on this note

Also on 1 July

All 1 July articles →