UPSC Prelims Practice Questions — ‘Investment in green energy corridor for grid stability to rise’

Q1. Which one of the following has been designated as the Implementing Agency for the Inter-State Transmission System under Green Energy Corridor (GEC) Phase-II for the 13 GW Renewable Energy project in Ladakh?

  • A. Solar Energy Corporation of India Limited (SECI)
  • B. NTPC Limited
  • C. Power Grid Corporation of India Limited (POWERGRID)
  • D. Central Transmission Utility of India Limited (CTUIL)

Q2. With reference to the Green Energy Corridor (GEC) Phase-II — Inter-State system for Ladakh as compared with the Intra-State GEC Phase-II scheme, consider the following statements: 1. The Central Financial Assistance (CFA) for the Ladakh Inter-State project is at a higher percentage of project cost than the CFA provided for the Intra-State GEC Phase-II. 2. Unlike the Intra-State GEC Phase-II, the Ladakh project will deploy Voltage Source Converter (VSC) based High Voltage Direct Current (HVDC) transmission. 3. Both schemes are executed only by Power Grid Corporation of India Limited as the implementing agency. Which of the statements given above is/are correct?

  1. The Central Financial Assistance (CFA) for the Ladakh Inter-State project is at a higher percentage of project cost than the CFA provided for the Intra-State GEC Phase-II.
  2. Unlike the Intra-State GEC Phase-II, the Ladakh project will deploy Voltage Source Converter (VSC) based High Voltage Direct Current (HVDC) transmission.
  3. Both schemes are executed only by Power Grid Corporation of India Limited as the implementing agency.
  • A. 1 only
  • B. 1 and 2 only
  • C. 2 and 3 only
  • D. 1, 2 and 3

Q3. The approval for the Green Energy Corridor (GEC) Phase-II — Inter-State Transmission System for the 13 GW Renewable Energy project in Ladakh was granted by which one of the following bodies?

  • A. Cabinet Committee on Security (CCS)
  • B. Cabinet Committee on Economic Affairs (CCEA)
  • C. Central Electricity Regulatory Commission (CERC)
  • D. Forum of Regulators (FoR) under the Electricity Act, 2003

Q4. How many States are covered under the Intra-State Transmission System – Green Energy Corridor (GEC) Phase-II scheme approved by the Cabinet Committee on Economic Affairs?

  • A. Five
  • B. Six
  • C. Seven
  • D. Eight