UPSC Prelims Practice Questions — India Marks Record-Breaking Year in Clean Energy in 2025 : Union Minister Pralhad Joshi
Q1. With reference to the non-fossil installed capacity figures announced by MNRE for the year 2025, consider the following statements. Which of the above is/are correctly identified?
- India's total non-fossil installed capacity reached about 266.78 GW at the end of 2025.
- This marked a year-on-year increase of about 22.6% over the 2024 level.
- Solar power accounted for about 135.81 GW of this non-fossil capacity.
- Wind power accounted for about 74.51 GW of this non-fossil capacity.
- A. 1 and 3 only
- B. 2 and 4 only
- C. 1, 2 and 3 only
- D. 1, 2, 3 and 4
Q2. In the context of India's power sector statistics, the term "non-fossil installed capacity" (used in the 266.78 GW figure for 2025) is best defined as which one of the following?
- A. Total installed electricity generation capacity from renewables together with large hydro and nuclear power
- B. Only the grid-connected solar and wind generation capacity in the country
- C. The actual quantum of electricity generated from renewable sources during a year
- D. Renewable generation capacity excluding large hydro and nuclear power
Q3. The Panchamrit pledge of achieving 500 GW of non-fossil energy installed capacity by 2030 is primarily operationalised within the Government of India by which one of the following ministries?
- A. Ministry of New and Renewable Energy
- B. Ministry of Power
- C. Ministry of Environment, Forest and Climate Change
- D. Ministry of Coal
Q4. In June 2025 India crossed a major climate-related threshold a full five years ahead of its stated deadline. Which one of the following did India achieve?
- A. 50 per cent of installed electricity capacity from non-fossil fuel sources
- B. 500 GW of non-fossil installed capacity
- C. 50 per cent of annual electricity generation from renewable sources
- D. Net-zero emissions in the power sector
Q5. With reference to the evolution of India's Nationally Determined Contributions (NDCs), consider the following statements. Which of the statements given above is/are correct?
- Under the original 2015 NDC, India targeted a 40 per cent share of non-fossil-based installed electric power capacity by 2030.
- The updated 2022 NDC raised the emissions-intensity reduction target for GDP from 33–35 per cent to 45 per cent by 2030 over the 2005 level.
- The updated 2022 NDC was formally communicated to the UNFCCC by the Ministry of New and Renewable Energy.
- A. 1 and 2 only
- B. 2 and 3 only
- C. 1 and 3 only
- D. 1, 2 and 3
Q6. With reference to the National Action Plan on Climate Change (NAPCC) and the National Solar Mission, consider the following statements. Which of the statements given above is/are correct?
- The NAPCC comprises eight national missions, including the National Solar Mission.
- The Jawaharlal Nehru National Solar Mission originally set a grid-connected solar target of 20,000 MW by 2022, later revised upward to 1,00,000 MW.
- Unlike the National Solar Mission, the National Water Mission is not one of the eight missions under the NAPCC.
- A. 1 and 2 only
- B. 1 and 3 only
- C. 2 and 3 only
- D. 1, 2 and 3
Q7. The Jawaharlal Nehru National Solar Mission is implemented as a national mission by which one of the following ministries?
- A. Ministry of New and Renewable Energy
- B. Ministry of Environment, Forest and Climate Change
- C. Ministry of Power
- D. Ministry of Science and Technology
Q8. The National Green Hydrogen Mission was approved by the Union Cabinet with which one of the following initial total outlays, and in which year?
- A. ₹19,744 crore, in 2023
- B. ₹19,744 crore, in 2021
- C. ₹17,490 crore, in 2023
- D. ₹75,021 crore, in 2023
Q9. With reference to the PM Surya Ghar: Muft Bijli Yojana, consider the following statements. Which of the above is/are NOT correct?
- It provides free electricity of up to 300 units per month to beneficiary households.
- It has a total outlay of ₹75,021 crore.
- It targets rooftop solar installation in one crore households.
- The Central Financial Assistance under the scheme is available for systems capped at 5 kW capacity.
- A. 1 only
- B. 4 only
- C. 3 and 4 only
- D. 2 and 4 only
Q10. With reference to the institutional framework under the Ministry of New and Renewable Energy (MNRE), consider the following statements. Which of the above is/are NOT correct?
- The Solar Energy Corporation of India (SECI) functions as a renewable energy implementing agency under MNRE.
- The Indian Renewable Energy Development Agency (IREDA) is a Mini Ratna non-banking financial company under the administrative control of MNRE.
- IREDA was set up in 1987 as a specialised financing agency for the renewable energy sector.
- The National Institute of Solar Energy functions under the Ministry of Power.
- A. 4 only
- B. 1 and 4 only
- C. 3 only
- D. 2 and 3 only
Q11. With reference to the components of the PM-KUSUM scheme, consider the following statements. Which of the above is/are correctly identified?
- Component-A provides for decentralised ground/stilt-mounted grid-connected renewable power plants of up to 2 MW capacity.
- Component-B provides for the installation of standalone (off-grid) solar-powered agriculture pumps.
- Component-C provides for the solarisation of grid-connected agriculture pumps.
- Component-D provides for solar rooftop installations on the residences of participating farmers.
- A. 1 and 2 only
- B. 1, 2 and 3 only
- C. 2, 3 and 4 only
- D. 1, 2, 3 and 4