UPSC Prelims Practice Questions — DRDO conducts successful maiden flight-test of ‘Kusha’ Long-Range Surface-to-Air Missile
Q1. Under 'Project Kusha', how many variants of interceptors does the DRDO envisage for providing layered air defence coverage?
- A. Two
- B. Three
- C. Four
- D. Five
Q2. With reference to Project Kusha and the S-400 Triumf, consider the following statements:
1. Project Kusha was sanctioned by the Cabinet Committee on Security, whereas the S-400 was acquired through an inter-governmental agreement with Russia.
2. Unlike the imported S-400, all elements of the Kusha system — missiles, radars and command-and-control centre — are indigenously developed.
3. Like the S-400, Project Kusha is designed as a short-range point-defence system.
Which of the statements given above is/are correct?
- Project Kusha was sanctioned by the Cabinet Committee on Security, whereas the S-400 was acquired through an inter-governmental agreement with Russia.
- Unlike the imported S-400, all elements of the Kusha system — missiles, radars and command-and-control centre — are indigenously developed.
- Like the S-400, Project Kusha is designed as a short-range point-defence system.
- A. 1 and 2 only
- B. 2 and 3 only
- C. 1 and 3 only
- D. 1, 2 and 3
Q3. Regarding the maiden flight-test of the Kusha LR-SAM, consider the following statements:
1. The test conducted on 23 July 2026 was carried out against an electronic target simulating a high-speed, high-altitude aerial threat.
2. The Kusha system is designed to intercept every category of aerial threat without exception, including satellites in low-earth orbit.
3. The maiden test was carried out entirely with imported radars while only the missiles were indigenous.
Which of the statements given above is/are correct?
- The test conducted on 23 July 2026 was carried out against an electronic target simulating a high-speed, high-altitude aerial threat.
- The Kusha system is designed to intercept every category of aerial threat without exception, including satellites in low-earth orbit.
- The maiden test was carried out entirely with imported radars while only the missiles were indigenous.
- A. 1 and 2 only
- B. 1 only
- C. 2 and 3 only
- D. 1, 2 and 3
Q4. The maiden flight-test of the 'Kusha' Long-Range Surface-to-Air Missile was conducted by which one of the following organisations?
- A. Indian Space Research Organisation (ISRO)
- B. Hindustan Aeronautics Limited (HAL)
- C. Defence Research and Development Organisation (DRDO)
- D. BrahMos Aerospace Private Limited
Q5. APJ Abdul Kalam Island, which serves as one of India's principal missile integration and launch sites, is located off the coast of which state?
- A. Odisha
- B. Andhra Pradesh
- C. Tamil Nadu
- D. West Bengal
Q6. The Integrated Test Range on APJ Abdul Kalam Island, from which the Kusha missile was tested, functions under which one of the following Union Ministries?
- A. Ministry of Home Affairs
- B. Ministry of Earth Sciences
- C. Ministry of Science and Technology
- D. Ministry of Defence
Q7. Under its 2018 contract with Russia, how many squadrons of the S-400 Triumf air defence system did India agree to procure?
- A. Three
- B. Five
- C. Four
- D. Six
Q8. In which year did India sign the inter-governmental agreement with Russia for the procurement of the S-400 Triumf air defence system?
- A. 2015
- B. 2016
- C. 2018
- D. 2020
Q9. Consider the following surface-to-air missile systems:
1. Akash
2. QRSAM
3. MRSAM (Barak-8)
4. S-400 Triumf
Which of the above are correctly identified as systems developed indigenously by the DRDO (without a foreign development partner)?
- Akash
- QRSAM
- MRSAM (Barak-8)
- S-400 Triumf
- A. 1 and 2 only
- B. 2 and 4
- C. 1, 3 and 4
- D. 3 and 4
Q10. Consider the following statements comparing the induction of Kusha with the S-400:
1. Phased induction of Kusha into the armed forces is expected between 2028 and 2030.
2. The fifth and final S-400 squadron is expected to be delivered before Kusha's induction begins.
3. On induction, Kusha is intended to replace the Akash system in the short-range point-defence role.
Which of the statements given above is/are correct?
- Phased induction of Kusha into the armed forces is expected between 2028 and 2030.
- The fifth and final S-400 squadron is expected to be delivered before Kusha's induction begins.
- On induction, Kusha is intended to replace the Akash system in the short-range point-defence role.
- A. 1 only
- B. 1 and 3 only
- C. 1 and 2 only
- D. 1, 2 and 3
Q11. Consider the following statements about India's surface-to-air missile systems:
1. Kusha is classified as a Long-Range SAM, whereas the land-based MRSAM (Barak-8) is a Medium-Range SAM.
2. QRSAM is a quick-reaction short-range system, in contrast to the long-range Kusha.
3. The MRSAM was developed jointly by the DRDO and the United States, unlike the fully indigenous Kusha.
Which of the statements given above is/are correct?
- Kusha is classified as a Long-Range SAM, whereas the land-based MRSAM (Barak-8) is a Medium-Range SAM.
- QRSAM is a quick-reaction short-range system, in contrast to the long-range Kusha.
- The MRSAM was developed jointly by the DRDO and the United States, unlike the fully indigenous Kusha.
- A. 2 and 3 only
- B. 1 and 2 only
- C. 1 and 3 only
- D. 1, 2 and 3