UPSC Prelims Practice Questions — Cabinet approves PM-DHARA (PM-Developing Harmonized and Accelerated Renewable-energy Access) Scheme for Development of Intra-State Transmission System with Battery Energy Storage Systems
Q1. Government projections for 2031-32 envisage battery energy storage of about 47 GW paired with about 236 GWh. What does the ratio of the second figure to the first (about 5) represent?
- A. The multiple by which storage raises the grid's peak power capacity
- B. The number of hours the fleet can discharge at its full rated power
- C. The number of years the battery cells last before needing replacement
- D. The number of full charge-discharge cycles each battery completes daily
Q2. Green Energy Corridor Phase-III pairs intra-State evacuation capacity for up to 135 GW of renewable energy with 50 GWh of battery energy storage. In this context, consider the following statements: Which of the statements given above is/are correct?
- The 50 GWh figure by itself specifies the maximum power the storage fleet can inject into the grid at any instant.
- If the 50 GWh fleet had an aggregate rated output of 25 GW, it could, starting fully charged, sustain that output for about two hours.
- At the full 135 GW evacuation level, 50 GWh of storage could substitute for all renewable output for more than an hour.
- A. 1 only
- B. 1, 2 and 3
- C. 2 and 3 only
- D. 2 only
Q3. Consider the following statements: Which of the following is correct in respect of the above statements?
- Renewable capacity in a resource-rich State can remain stranded or be curtailed even when there is unmet demand for electricity elsewhere in the country.
- Central financial assistance under the Green Energy Corridor programme is meant to offset intra-State transmission charges and so keep delivered power costs down.
- A. Both Statement-I and Statement-II are correct and Statement-II explains Statement-I
- B. Both Statement-I and Statement-II are correct, but Statement-II does not explain Statement-I
- C. Statement-I is correct, but Statement-II is incorrect
- D. Statement-I is incorrect, but Statement-II is correct
Q4. With reference to the procurement models adopted for new intra-State transmission lines under Green Energy Corridor Phase-III, consider the following statements: Which of the statements given above is/are correct?
- Under Tariff Based Competitive Bidding, the transmission tariff is discovered through competing bids rather than computed by the regulator from the project's audited cost.
- Under the Build-Own-Operate-Maintain model, the winning transmission service provider retains ownership of the asset and is responsible for running and maintaining it.
- Under Tariff Based Competitive Bidding, the tariff payable to the transmission service provider is periodically revised to pass through its actual construction cost overruns.
- A. 1 and 2 only
- B. 1, 2 and 3
- C. 1 only
- D. 2 and 3 only
Q5. Under the intra-State track of the Green Energy Corridor programme, central financial assistance was 40% of project cost in Phase-I and 33% of a ₹12,031 crore cost in Phase-II. Phase-III has a total outlay of ₹1,86,405 crore, with central support of ₹54,082 crore. In each phase, the assistance is meant to offset intra-State transmission charges. Which of the following inferences can be drawn from the above?
- States and their consumers bear a larger proportion of project cost in Phase-III than in Phase-I.
- The Centre's absolute financial commitment in Phase-III is smaller than its commitment in Phase-II.
- Other things being equal, a smaller central share leaves a larger part of project cost to be recovered through transmission charges.
- The Centre has deprioritised renewable-energy transmission relative to other infrastructure sectors.
- A. 1, 2 and 3 only
- B. 1, 3 and 4 only
- C. 1 and 3 only
- D. 2 and 4 only
Q6. Consider the following assertion: Pairing battery storage with transmission expansion can reduce the transmission capacity needed to evacuate a given quantity of solar energy. Which of the following statements support/supports the above assertion?
- Storage at the generator end can absorb output during the midday peak and release it when the lines have spare capacity.
- Solar generation is concentrated in daylight hours, so lines sized for the midday peak remain under-used at night.
- Battery storage capacity is expressed in GWh, whereas transmission capacity is expressed in GW.
- Green Energy Corridor Phase-III places battery storage exclusively at the generator end of renewable projects.
- A. 2, 3 and 4 only
- B. 1 and 3 only
- C. 1, 2 and 4 only
- D. 1 and 2 only