Infrastructure MCQs for UPSC Prelims — September 2026

Q1. The proposed Hebbal–Central Silk Board tunnel road is reported to require approximately how many acres of Lalbagh land on a temporary basis during construction?

  • A. Two
  • B. Four
  • C. Six
  • D. Nine