·The Hindu·15 marks·250–350 wordsGeographyPolityEnvironment

Compare the Gadgil and Kasturirangan Committee approaches to Western Ghats conservation. Why has the latter also faced sustained opposition from states?

In this answer
  1. Comparing the two approaches
  2. Why opposition persists

The Western Ghats, a UNESCO World Heritage Site and biodiversity hotspot, has been assessed twice — by the Western Ghats Ecology Expert Panel (Gadgil, 2011) and the High Level Working Group (Kasturirangan, 2013) [1][2]. Though the latter substantially diluted the former, both remain unnotified, revealing a deeper federal deadlock.

Comparing the two approaches

  • Extent: Gadgil treated the entire Ghats as ecologically sensitive (~64%, graded into ESZ I, II and III); Kasturirangan separated "natural" from "cultural" landscape and confined the Ecologically Sensitive Area to ~60,000 sq km (37%) across six states [1][2].
  • Method: Gadgil relied on field-based, participatory ecological assessment; Kasturirangan used remote-sensing/satellite demarcation of contiguous natural cover — faster, but desk-based [1].
  • Regulation: Gadgil proposed graded, activity-wise phase-outs; Kasturirangan imposed a blanket ban on mining, quarrying, red-category industries and thermal power within the ESA, while sparing plantations and settlements [1].
  • Governance: Gadgil envisaged a decentralised Western Ghats Ecology Authority with gram sabha consent; Kasturirangan left implementation to MoEFCC notification under the Environment (Protection) Act, 1986 [3].

Why opposition persists

  • Method, not conservation: satellite imagery cannot distinguish coffee or areca plantations from natural forest, so Karnataka has consistently demanded village-level ground verification before notification [1][4].
  • Unequal burden: Karnataka carries the largest state share (~20,668 sq km), spanning over a thousand villages [1][5].
  • Federal friction: land and agriculture are State subjects, yet restrictions flow from a Central notification, leaving states to absorb the political cost [3].
  • Prolonged uncertainty: successive draft notifications since 10 March 2014, repeatedly re-issued and lapsed, keep village lists shifting — depressing land values and fuelling farmer anxiety in Malnad and coastal districts [3][5].

The dispute is therefore procedural rather than anti-ecological. A final, ground-truthed notification prepared jointly with states, preceded by settlement of claims under the Forest Rights Act, 2006, can convert fear into cooperation — securing both the Ghats' hydrological lifeline and the livelihoods it sustains.

Sources

  1. 1Report of the High Level Working Group on Western Ghats, Volume I (Kasturirangan, 2013) — MoEFCCESA extent (~37%/60,000 sq km), satellite-based delineation, ban list, state-wise area, review of Gadgil panel
  2. 2Report of the Western Ghats Ecology Expert Panel (Gadgil, 2011) — MoEFCCwhole-Ghats ESA, ESZ I/II/III zoning, decentralised ecology authority
  3. 3Schemes to protect Western Ghats — PIB, Ministry of Environment, Forest and Climate Changedraft ESA notification of 10 March 2014 under the Environment (Protection) Act, 1986; repeated re-notifications for six states
  4. 4Minutes of the meeting to discuss the Ecologically Sensitive Areas (ESA) of Western Ghats — MoEFCCstate demands for physical/ground verification of ESA boundaries
  5. 5States express desire to expedite early notification of Ecologically Sensitive Area of Western Ghats — PIBpending state consent, village-level concerns and delay in final notification
Practice
12 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

More from this note

More on Geography