·The Hindu·15 marks·250–350 words

Differentiate between nuclear fission and fusion. How can India's experience with SST-1 and ITER position it in the global fusion race?

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Fission vs Fusion
  2. How SST-1 and ITER position India
  3. Gaps to bridge

Nuclear energy can be released in two opposite ways: by splitting heavy nuclei (fission) or by joining light ones (fusion). India already generates power from fission. Its work on SST-1 and ITER is now giving it real capability in fusion as well.

Fission vs Fusion

Basis Fission Fusion
Process A heavy nucleus (uranium) splits Light nuclei (deuterium + tritium) merge [1]
Products Radioactive fragments; long-lived waste Helium (an inert gas) + a fast neutron [1]
Control Self-sustaining chain reaction that must be controlled No runaway chain reaction [1]
Conditions A critical mass of fuel About 100 million °C plasma, held away from the walls by magnets in a tokamak [1]
Status Used by all current nuclear plants [1] Experimental; electricity is "a further step away" [1]

How SST-1 and ITER position India

  • Home-grown tokamak line: under DAE, India has more than three decades of fusion work, moving from ADITYA to ADITYA-U and then SST-1 [5].
  • Superconducting magnet skills: SST-1 at IPR, Gandhinagar produced its first plasma on 20 June 2013 [3]. By 2015 it gave repeatable discharges of about 500 ms with plasma currents above 60 kA [4]. This built Indian skills in magnets and cryogenics (very low-temperature engineering) [2].
  • Role in ITER: India is developing a Lead-Lithium Ceramic Breeder Test Blanket Module [3]. It also supplies the cryostat, cryogenic distribution, cooling water system and in-wall shield blocks [5].
  • Industry ecosystem: these ITER parts were made by Indian industries, including many SMEs [5]. That base supports private entry: Bengaluru's Pranos Fusion has built the PRAGYA test tokamak and aims to finish the PRANIK design by 2027 [1].
  • Global role: at the IAEA World Fusion Energy Group, India proposed fusion-fission hybrids to produce power or burn up radioactive waste [5]. This links fusion to India's fission programme.

Gaps to bridge

  • SST-1 pulses of about 500 ms [4] are still far from true steady-state operation.
  • Fusion electricity "would be expensive now" [1]. Private entry also needs clear rules for licensing and tritium handling.

SST-1 has given India hands-on engineering skills, and ITER has given it large-scale experience and a place in global work. Together they make India a credible contributor to the fusion race, though not yet a leader. A focused fusion mission, IPR–industry partnerships and clear regulation could turn this into lasting technology leadership, in line with SDG 7 and the goal of Atmanirbhar Bharat.

Sources

  1. 1"India's first fusion power company sets road map for a nuclear reactor" – The Hindu, 1 Nov 2026 (news report)difference between fission and fusion, D-T products, 100 million °C, tokamak, PRAGYA/PRANIK, cost of fusion electricity
  2. 2DAE / Institute for Plasma Research – SST-1 (Research Facilities)SST-1 superconducting magnet and cryogenic facility at IPR, Gandhinagar
  3. 3Statement by Chairman AEC at the 57th IAEA General Conference, Vienna (18 Sept 2013)SST-1 first plasma on 20 June 2013; ITER Test Blanket Module
  4. 4Statement by Dr. Ratan Kumar Sinha at the 59th IAEA General Conference (16 Sept 2015)SST-1 discharges of about 500 ms and currents above 60 kA
  5. 5Inaugural Ministerial Meeting of the IAEA World Fusion Energy Group: Statement by IndiaADITYA → ADITYA-U → SST-1; ITER parts made by Indian industry and SMEs; fusion-fission hybrid

More from this note