Nuclear fusion has long been described as 'always 30 years away'. In light of private-sector entry into India's fusion research, examine the technological and regulatory challenges in making fusion a viable energy source.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Technological challenges
  2. Regulatory challenges
  3. Way forward

Nuclear fusion joins deuterium and tritium into helium and a fast neutron at about 100 million °C, offering clean power without a runaway chain reaction [1]. Fusion power has long seemed "30 years away." Bengaluru-based Pranos Fusion has now built the test tokamak PRAGYA and aims to finish the PRANIK blueprint by 2027 [1]. That raises a fair question: can private enterprise close this gap?

Technological challenges

  • Confinement: no material wall can survive plasma this hot, so superconducting magnets must hold it in place. This is why PRAGYA is testing magnets and plasma control first [1].
  • Steady-state operation: SST-1 at IPR, Gandhinagar, was designed for 1,000-second plasmas [2]. Its repeatable discharges reached only about 500 ms by 2015 [3].
  • The step to electricity: sustained burn, then net energy gain, then grid power are separate hurdles. The CEO admits electricity is "a further step away" and "would be expensive now" [1].
  • Schedule slippage: ITER's 2024 baseline pushed deuterium-tritium operations to 2039, at about €5 billion extra [7].
  • Engineering supply chain: ITER components posed "first-of-a-kind" challenges for IPR and Indian industry [3].

Regulatory challenges

  • A law written for fission: the SHANTI Act, 2025 replaced the Atomic Energy Act, 1962 and the CLND Act, 2010. It allows private licensees and gives the AERB statutory status [5][6]. However, its licensing covers reactors and the fuel cycle and does not say how tokamaks are classified [6].
  • Unclear status of fuel: isotopic separation stays with the Centre "unless otherwise notified." It is unclear whether this covers deuterium and tritium handling [5].
  • Liability mismatch: operator liability ranges from ₹100–3,000 crore depending on the facility [5]. A fission-sized band would raise fusion's costs without a matching safety reason.

Way forward

  • AERB should notify a fusion-specific category covering tritium and neutron-activated materials. The US NRC's proposed rule regulates fusion machines under byproduct-material rules, not reactor rules [8].
  • Startups should draw on IPR's expertise and its ITER-built industrial base through public-private partnerships [3]. India's interest in fusion-fission hybrids that burn radioactive waste could also bring nearer-term benefits [4].

Fusion faces hurdles in both physics and regulation. India should treat it as long-term research, mostly funded privately and through international partners, without diverting attention from solar and fission. A clear fusion-specific rulebook and IPR's three decades of experience could finally shorten the "30 years," in line with SDG 7 and India's net-zero 2070 goal.

Sources

  1. 1India's first fusion power company sets road map for a nuclear reactor, The Hindu (1 Nov 2026): fusion basics, PRAGYA and PRANIK, 2027 blueprint, electricity "a further step away" and expensive
  2. 2Steady State Superconducting Tokamak SST-1, Department of Atomic Energy: SST-1 at IPR, Gandhinagar; 1,000 s design goal
  3. 3Statement by Chairman, AEC at the 59th IAEA General Conference (2015), DAE: about 500 ms SST-1 discharges; ITER components built with Indian industry
  4. 4Statement by India, Inaugural Ministerial Meeting of the IAEA World Fusion Energy Group, DAE: interest in fusion-fission hybrids for waste burning
  5. 5SHANTI Bill, 2025 explainer, PIB: private participation, AERB statutory recognition, reserved activities, liability bands
  6. 6PRS Bill Summary: SHANTI Bill, 2025: laws replaced, private licensing scope for plants, reactors and fuel
  7. 7ITER Baseline 2024 press conference summary, ITER Organization: deuterium-tritium operations delayed to 2039
  8. 8Regulatory Framework for Fusion Machines, proposed rule, US NRC, Federal Register (26 Feb 2026): fusion regulated under byproduct-material rules (Part 30), not reactor licensing