·The Hindu·15 marks·250–350 words

Examine whether the Supreme Court's original jurisdiction works as an effective way to settle inter-state water disputes, using recent Cauvery basin litigation as an example.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Where it works
  2. Where it falls short
  3. Way forward

Article 131 lets the Supreme Court hear disputes between states directly. Karnataka used this route when it filed an original suit against Tamil Nadu and the Union over the Cauvery (Kattalai)–Vaigai–Gundar (CVG) Link. In November 2026 it sought a fresh injunction in that suit [1]. Recent cases show the route is fair and even-handed, but it is too slow to stop facts being created on the ground.

Where it works

  • Direct, binding forum: States can sue each other and make the Union a party. That brings the Centre's approval powers under the Court's eye [1].
  • Consistent restraint (ripeness): In January 2025 the Court called Karnataka's plea for interim relief premature because the Centre had not approved the CVG Link [1]. On 13 November 2025 it applied the same test to Tamil Nadu's challenge to Karnataka's Mekedatu project [2]. Treating both states alike builds trust in the Court.

Where it falls short

  • Limited mandate: Article 262 and the ISRWD Act, 1956 keep water allocation with tribunals. The Court can only judge legality and enforce awards.
  • Ripeness gap: Tamil Nadu asked for central approval on 5 January 2021. Its own status report says Phase-I work began on 21 January 2021, while the Court was still waiting for that approval [1].
  • Information asymmetry: Karnataka learned of the works only through a Madras High Court order, and alleges that Tamil Nadu hid them from the Supreme Court [1].
  • Technical questions: How much water is "surplus" is a hydrology question. The NWDA itself says the link depends on Mahanadi–Godavari water that has not yet arrived [3].
  • Consensus is a political issue: The Union lists Karnataka, Tamil Nadu, Kerala and Puducherry as party states and says links need their consensus [4]. A court decree cannot create that consensus.

Way forward

  • Sworn disclosure of all works already built, plus a status quo on new works until the suit is decided.
  • No central approval until the party states agree [4].
  • One basin-wide rule for both Mekedatu and the CVG Link, with the CWMA overseeing technical data.

The Court's original jurisdiction is a useful backstop for legality and fairness, but it does not settle disputes on its own. It works best alongside expert, basin-level bodies and real consensus among states. That combination is what the cooperative federalism of Articles 131 and 262 intends.

Sources

  1. 1The Hindu, "Karnataka files plea in SC to restrain T.N. govt. from executing Cauvery link project" (25 November 2026)original suit; injunction plea; January 2025 order; 5/21 January 2021 dates; Madras HC order; alleged non-disclosure
  2. 2Supreme Court of India, judgment dated 13 November 2025 (Mekedatu applications)Tamil Nadu's plea against Mekedatu held premature
  3. 3NWDA, "ILR in Parliament"CVG Link depends on upstream Mahanadi–Godavari water
  4. 4NWDA, Chapter 3: Interstate Aspectsparty states named; links need party-state consensus

More from this note