"Intra-state river-linking projects that use inter-state river water test the limits of cooperative federalism." Discuss with reference to the Cauvery–Vaigai–Gundar link.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →In this answer
Water is a State subject under Entry 17, but it is subject to Union regulation under Entry 56 and to Article 262. The Cauvery (Kattalai)–Vaigai–Gundar (CVG) link is a canal inside Tamil Nadu that would divert 2,252 MCM of Cauvery water [2]. Karnataka's new plea in its original suit before the Supreme Court [1] shows how such projects fall into gaps in India's federal design.
How the CVG link strains cooperative federalism
- The "surplus" dispute: Tamil Nadu says it will use only surplus flood water. Karnataka says no state can claim water the sharing formula does not clearly allocate unless the other basin states agree [1].
- An "intra-state" label for an inter-state river: NWDA lists Karnataka, Tamil Nadu, Kerala and Puducherry as party states for this link [2]. The Union itself does not treat it as a one-state project.
- Building before approval: Tamil Nadu sought in-principle approval and national project status on 5 January 2021. Its own status report says Phase-I work began on 21 January 2021 [1]. Later works, once built, can become a claim in future disputes.
- Questions of candour: Karnataka alleges that Tamil Nadu did not tell the Court about this work [1]. That weakens the trust cooperative federalism depends on.
- Upstream water not yet available: The CVG link is the last link of the Peninsular plan and was meant to run on Mahanadi–Godavari water [2]. Those upstream links still need agreement among the states [4], so for now the canal can only carry Cauvery water.
Where federal mechanisms still work
- Courts as referee: Article 131 gives states a forum. In January 2025 the Court called interim relief premature because the Centre had not approved the project [1]. On 13 November 2025 it applied the same test to Tamil Nadu's plea against Mekedatu [3]. The rule is the same for both states.
- The Centre's approval as a check: In-principle approval and national project status are still central levers, and the Ministry says links need agreement among the states first [4].
Way forward
- The Court could order full disclosure of works and keep status quo on new works.
- The Centre should approve nothing until the party states agree [4].
- NWDA should publish fresh estimates of how much surplus water exists.
- One shared rule should cover Mekedatu and the CVG link alike.
The CVG link shows that a state's own development needs and the rights of other basin states have to be balanced. A rule of no new Cauvery diversion without basin-state consent or a court decision would turn rivalry over water into shared governance of the river, as the federal spirit of Article 262 intends.
Sources
- 1The Hindu, "Karnataka files plea in SC to restrain T.N. govt. from executing Cauvery link project" (25 November 2026)original suit; approval request on 5 January 2021; Phase-I work since 21 January 2021; non-disclosure claim; January 2025 order; "surplus" dispute
- 2NWDA, DPR Chapter 3: Interstate Aspects, Cauvery (Kattalai)–Vaigai–Gundar Link2,252 MCM diverted from Kattalai; four party states; dependence on Mahanadi–Godavari water
- 3Supreme Court of India, Judgment dated 13 November 2025 (Mekedatu applications)Tamil Nadu's plea against Mekedatu held premature
- 4NWDA, "ILR in Parliament" (compilation of parliamentary replies)party states must agree before links are built; status of the upstream Peninsular links