Consultations on for offshore wind tenders in TN: official
In this note
Practice
10 questions on this article
Check the answer for each question, or reveal all at once.
1. At a Glance
- Union Renewable Energy Ministry is holding fresh consultations for a new offshore wind tender off Tamil Nadu, after an earlier tender failed to draw adequate response [3].
- National Institute of Wind Energy (NIWE) has completed all feasibility studies (wind velocity, geo-technical, geo-physical) off the TN coast, with Capacity Utilisation Factor (CUF) >50% [3].
- Relevant for UPSC as it intersects renewable energy policy, coastal/marine governance, India's climate/NDC commitments, and Centre–State execution of infrastructure tenders.
- India targets 30 GW offshore wind capacity by 2030 [2].
2. Why in the News
- On 2 September 2026, Rajesh Kulhari, Joint Secretary, Union Ministry of New and Renewable Energy (MNRE), told reporters that consultations are underway for introducing a new tender for offshore wind in Tamil Nadu, citing completed feasibility studies and CUF above 50% [3].
- He noted the government had earlier faced a "setback" in Tamil Nadu as tenders did not receive the anticipated response [3].
3. Background & Evolution
- Government initially identified eight potential offshore wind zones each off Tamil Nadu and Gujarat [1][3].
- NIWE's assessment: nearly 35 GW potential off Tamil Nadu and ~36 GW off Gujarat [2].
- Offshore Wind Energy Lease Rules notified 19 December 2023 to regulate leasing of offshore areas [1].
- Solar Energy Corporation of India (SECI) issued the first 4 GW seabed lease tender (four blocks of 1 GW each, international competitive bidding) off Tamil Nadu under captive/bilateral/open-access modes [1].
- This first tender attempt saw poor investor response, prompting Viability Gap Funding (VGF) Scheme, which itself went from "zero bids" to a second attempt [1].
- NIWE has historically deployed LiDAR-based measurement campaigns off Gujarat and Tamil Nadu coasts for resource assessment [2].
4. Core Static Facts
| Item | Detail |
|---|---|
| Nodal Ministry | Ministry of New and Renewable Energy (MNRE) [3] |
| Implementing/Technical body | National Institute of Wind Energy (NIWE) [1][3] |
| Bid-issuing agency | Solar Energy Corporation of India (SECI) [1] |
| Regulatory instrument | Offshore Wind Energy Lease Rules, 2023 (notified 19 Dec 2023) [1] |
| Identified zones | 8 off Tamil Nadu + 8 off Gujarat [1][3] |
| TN offshore potential | ~35 GW [2] |
| Gujarat offshore potential | ~36 GW [2] |
| First TN tender size | 4 GW (4 blocks × 1 GW), international competitive bidding [1] |
| CUF (offshore, TN — Thoothukudi coast) | Up to 50%+ [2][3]; national offshore CUF range 30–40% [2] |
| Onshore wind CUF (comparison) | ~25% [2] |
| National target | 30 GW offshore wind capacity by 2030 [2] |
5. Multi-Dimensional Analysis
Economic
- High CUF (>50%) in Tamil Nadu makes offshore wind commercially more attractive than onshore (25% CUF), potentially lowering per-unit cost over time [2][3].
- Poor initial bid response indicates high capital cost/financing risk, necessitating VGF support [1].
Environmental
- Offshore wind avoids land-use conflicts common with onshore wind/solar, relevant to India's coastal ecology and EIA processes; Rapid EIA studies were conducted by NIWE off TN [1].
Geopolitical/Strategic
- Supports India's energy security and diversification of the renewable mix beyond solar-heavy capacity additions; aligns with India's NDC and net-zero-by-2070 commitment.
Legal/Administrative
- Governed by the Offshore Wind Energy Lease Rules, 2023, which formalize seabed leasing — a novel regulatory domain for India straddling Union subjects (EEZ, energy) [1].
- Central agencies (MNRE/NIWE/SECI) drive project development even though the project site lies off a state's coast — a Centre-led model, unlike onshore renewable siting which involves more state discretion.
Scientific/Technological
- Reliance on LiDAR, geo-technical and geo-physical surveys, and oceanographic (wave/tide/current) studies for site characterization [1][2].
6. Recent Developments (last 12–18 months)
- 2 September 2026: MNRE Joint Secretary Rajesh Kulhari announces fresh consultations for a new TN offshore wind tender, confirming completion of all feasibility studies and CUF >50% [3].
- Prior: SECI's first 4 GW TN offshore wind seabed lease tender (under the 2023 Lease Rules) failed to elicit adequate bids, prompting a re-think and VGF-based approach [1].
7. Prelims Hooks
- Nodal ministry for offshore wind tenders: Ministry of New and Renewable Energy (MNRE), not MoEFCC [3].
- Technical/resource-assessment body: National Institute of Wind Energy (NIWE) [3].
- Tender/bid-issuing agency: Solar Energy Corporation of India (SECI) [1].
- Offshore Wind Energy Lease Rules notified on 19 December 2023 [1].
- Eight potential offshore wind zones identified each off Tamil Nadu and Gujarat [1][3].
- TN offshore wind potential estimated at ~35 GW; Gujarat at ~36 GW [2].
- First TN offshore wind tender: 4 GW capacity, 4 blocks of 1 GW each, via international competitive bidding [1].
- Offshore wind CUF in India: 30–40% generally, up to >50% off the Thoothukudi coast, Tamil Nadu [2][3].
- Onshore wind CUF in India for comparison: ~25% [2].
- India's offshore wind capacity target: 30 GW by 2030 [2].
- The earlier TN offshore tender saw a poor/zero-bid response, leading to consideration of a Viability Gap Funding (VGF) Scheme [1].
8. Mains Relevance
- GS-III: Infrastructure — Energy; Conservation; Environmental Pollution and Degradation; Achievements of Indians in Science & Technology.
- GS-II (secondary): Government policies and interventions for development in various sectors.
- Possible question stems: 1. Discuss the potential and challenges of offshore wind energy development in India with special reference to Tamil Nadu and Gujarat. (GS-III) 2. Examine why India's first offshore wind seabed lease tender failed to attract adequate investor interest. What policy instruments can address this? (GS-III) 3. Offshore wind energy can be a game-changer for India's renewable energy transition. Critically evaluate the regulatory and financial framework supporting it. (GS-II/III)
9. Related Topics to Study Next
- National Green Hydrogen Mission — offshore wind could feed green hydrogen production hubs.
- India's Renewable Energy Targets (500 GW non-fossil capacity by 2030) — offshore wind is a subset of this broader goal.
- Exclusive Economic Zone (EEZ) and Maritime Zones Act, 1976 — legal basis for offshore leasing.
- Viability Gap Funding (VGF) Scheme — financing mechanism now extended to offshore wind.
- PM-KUSUM / Solar Park schemes — comparative Centre-driven renewable siting models.
- National Institute of Wind Energy (NIWE) — institutional mandate and history.
- India's NDC and Net-Zero 2070 target — climate policy context.
- Coastal Regulation Zone (CRZ) Notification — environmental clearance overlap with offshore projects.
10. Common Errors / Trap Areas
- Confusing MNRE with MoEFCC as the nodal ministry — offshore wind sits under MNRE, not Environment Ministry [3].
- Mixing up NIWE (technical/resource assessment) with SECI (bid/tender-issuing agency) — different roles [1].
- Assuming offshore wind CUF is uniform nationally — TN's Thoothukudi coast figure (>50%) is a site-specific high, not the national offshore average (30–40%) [2].
- Treating the "eight zones" figure as combined — it is eight zones each for Tamil Nadu and Gujarat separately (16 total), not eight total [1][3].
- Assuming the Offshore Wind Energy Lease Rules are old policy — they were notified only in December 2023, a relatively recent regulatory development [1].
Sources
- 1Offshore Wind VGF Scheme: From Zero Bids To A Second Attemptimpriindia.com · tier 4
- 2Offshore Wind | Ministry of New and Renewable Energy, Indiamnre.gov.in · tier 1
- 3"Consultations on for offshore wind tenders in TN: official", The Hindu (Chennai print edition), 3 September 2026, p.13thehindu.com · tier 4
At the end · practice MCQs
10 questions on this article
Check the answer for each question, or reveal all at once.