·PIB

PARLIAMENT QUESTION: STATUS OF IMPLEMENTATION OF MISSION MAUSAM

In this note
  1. At a Glance
  2. Why in the News
  3. Background & Evolution
  4. Core Static Facts
  5. Multi-Dimensional Analysis
  6. Recent Developments (12-18 months)
  7. Prelims Hooks
  8. Mains Relevance
  9. Related Topics to Study Next
  10. Common Errors / Trap Areas

1. At a Glance

  • Mission Mausam is a Ministry of Earth Sciences (MoES) flagship to make India "weather-ready and climate-smart" through next-gen forecasting, observation, modelling and AI/ML services [1][2].
  • Cabinet-approved outlay of ₹2,000 crore over two years (FY 2024-25 & 2025-26) with implementation phased till 2031 [2][4].
  • UPSC relevance: tests GS-III (S&T, disaster management) overlap with climate adaptation, SDG-13, and India's "Vishwa Bandhu" weather diplomacy.

2. Why in the News

  • Parliament Question reply (12 March 2026) by Ministry of Earth Sciences in Lok Sabha detailing status of implementation — confirmed commissioning of HPC systems and quantified forecast-accuracy gains [1].
  • PM-inaugurated HPC systems ARKA & ARUNIKA on 26 Sept 2024; mission formally launched by PM on 14 Jan 2025 (IMD's 150th Foundation Day) [1][5].

3. Background & Evolution

  • 11 Sept 2024 — Union Cabinet approves Mission Mausam, outlay ₹2,000 cr / 2 yrs [2].
  • 26 Sept 2024 — PM inaugurates HPC systems "ARKA" at IITM Pune and "ARUNIKA" at NCMRWF Noida [1].
  • 14 Jan 2025 — PM launches Mission Mausam & releases IMD Vision-2047 at IMD's sesquicentennial [5].
  • 12 Mar 2026 — Implementation status placed before Parliament [1].
  • Predecessor / parallel: Monsoon Mission (2012), High Performance Computing System (HPCS) Pratyush & Mihir (2018), IMD Modernisation Phase-III.

4. Core Static Facts

  • Nodal Ministry: Ministry of Earth Sciences (MoES) — NOT MoEFCC [2].
  • Lead implementing institutes (3): India Meteorological Department (IMD), Indian Institute of Tropical Meteorology (IITM, Pune), National Centre for Medium-Range Weather Forecasting (NCMRWF, Noida) [2].
  • Outlay: ₹2,000 crore over two years (Phase-I FY25 & FY26); phased rollout up to 2031 [2][4].
  • HPC capacity post-commissioning: ARKA — 11.77 petaflops (IITM Pune); ARUNIKA — 8.24 petaflops (NCMRWF Noida); dedicated AI/ML system — 1.9 petaflops; total MoES HPC = 21.91 petaflops [1].
  • Beneficiary sectors: agriculture, disaster management, defence, aviation, water resources, power, tourism, shipping, transport, energy, health [2].
  • Key planned assets: expansion of Doppler Weather Radar network, wind profilers, radiosondes, ocean buoys, high-altitude balloons, mesonet observatories, urban testbeds, Cloud Chamber at IITM Pune (weather modification R&D) [4].

5. Multi-Dimensional Analysis

Scientific / Technological

  • Quantum jump in compute (≈3× over Pratyush+Mihir's 6.8 PF) enables higher-resolution global & regional models, ensemble forecasting, and AI/ML nowcasting [1].
  • IMD reports 30-40% improvement in severe-weather forecast accuracy over the past decade; significant leap in tropical cyclone track/intensity forecast in 2021-25 vs 2016-20 [1][3].

Administrative

  • Three-institute consortium model (IMD-IITM-NCMRWF) under single mission to avoid silos; phased till 2031 with annual milestones [1][2].

Environmental / Disaster Management

  • Directly feeds NDMA's CAP (Common Alerting Protocol) early-warning ecosystem; supports India's commitment to UN "Early Warnings for All" by 2027 [2].

Economic

  • Weather-sensitive sectors (agri, power, aviation, shipping) account for >50% of GDP; finer panchayat-level forecasts cut crop losses & power-grid risk [2].

Geopolitical / Strategic

  • Mission supports India's role as regional weather services provider under WMO for South Asia & IOR; bolsters "Vishwa Bandhu" climate diplomacy.

6. Recent Developments (12-18 months)

  • 11 Sept 2024 — Cabinet approval [2].
  • 26 Sept 2024 — ARKA & ARUNIKA HPC commissioned by PM [1].
  • 14 Jan 2025 — Mission Mausam formally launched on IMD's 150th Foundation Day; IMD Vision-2047 released [5].
  • 12 Mar 2026 — Lok Sabha Q&A: HPC operational, cyclone forecast skill improved 2021-25 vs 2016-20 [1].

7. Prelims Hooks

  • Mission Mausam approved by Union Cabinet on 11 September 2024 [2].
  • Total outlay: ₹2,000 crore over 2 years [2].
  • Nodal ministry: Ministry of Earth Sciences (not MoEFCC, not MoST) [2].
  • Three implementing institutes: IMD, IITM-Pune, NCMRWF-Noida [2].
  • HPC "ARKA" sits at IITM Pune (11.77 PF); "ARUNIKA" at NCMRWF Noida (8.24 PF) [1].
  • Dedicated AI/ML HPC = 1.9 petaflops; total MoES compute = 21.91 petaflops [1].
  • HPC inaugurated on 26 September 2024 by PM (video-conferencing) [1].
  • Mission launched alongside IMD Vision-2047 on 14 January 2025 (IMD's 150th year) [5].
  • Severe-weather forecast accuracy improved 30-40% over past decade [3].
  • Cloud Chamber for weather modification research is being set up at IITM Pune [4].
  • Implementation phased till 2031 [3].

8. Mains Relevance

  • GS-III: "Science & Technology — indigenization & developments"; "Disaster management"; "Climate change."
  • GS-II: "Government policies/interventions" (welfare via early-warning).
  • Likely stems: 1. "Mission Mausam marks a paradigm shift from forecasting to weather management. Discuss its components and challenges." (15M) 2. "Examine the role of high-performance computing and AI/ML in transforming India's weather services." (10M) 3. "How does Mission Mausam strengthen India's disaster-preparedness architecture in the context of the UN 'Early Warnings for All' initiative?" (15M)

9. Related Topics to Study Next

  • Monsoon Mission — predecessor seasonal-prediction programme by MoES.
  • IMD Vision-2047 — long-term roadmap released alongside.
  • Pratyush & Mihir supercomputers — earlier MoES HPC baseline.
  • PARAM Rudra / National Supercomputing Mission (MeitY-DST) — parallel HPC push [6].
  • NDMA & CAP-based early warning — downstream consumer.
  • Cyclone Mocha/Biparjoy/Remal forecasting case studies — to illustrate accuracy gains.
  • WMO & "Early Warnings for All" 2027 — global frame.
  • Cloud seeding / weather modification ethics — links to Cloud Chamber R&D.

10. Common Errors / Trap Areas

  • Wrong ministry: it is MoES, not MoEFCC or DST.
  • Wrong outlay period: ₹2,000 cr is for 2 years, not 5; total mission phased till 2031.
  • Mixing HPCs: ARKA is at Pune (IITM), ARUNIKA at Noida (NCMRWF) — easy to swap.
  • Confusing with Monsoon Mission or National Supercomputing Mission (PARAM Rudra) — different ministries (MoES vs MeitY/DST).
  • Launch dates: Cabinet approval (11 Sept 2024) ≠ PM launch (14 Jan 2025) ≠ HPC inauguration (26 Sept 2024).

Sources

  1. 1PARLIAMENT QUESTION: Status of Implementation of Mission Mausam (12 Mar 2026)pib.gov.in · tier 1
  2. 2Cabinet approves 'Mission Mausam' — ₹2,000 crpib.gov.in · tier 1
  3. 3PARLIAMENT QUESTION: Implementation of Mission Mausampib.gov.in · tier 1
  4. 4Mission Mausam Unveiled: 2000 Crore Initiativepib.gov.in · tier 1
  5. 5PM launches 'Mission Mausam', releases IMD Vision-2047pib.gov.in · tier 1
  6. 6PM dedicates three PARAM Rudra Supercomputerspib.gov.in · tier 1

Also on 12 March

All 12 March articles →