·PIB

PARLIAMENT QUESTION: PROGRESS UNDER NUCLEAR ENERGY MISSION

In this note
  1. At a Glance
  2. Why in the News
  3. Background & Evolution
  4. Core Static Facts
  5. Multi-Dimensional Analysis
  6. Recent Developments (last 12–18 months)
  7. Prelims Hooks
  8. Mains Relevance
  9. Related Topics to Study Next
  10. Common Errors / Trap Areas
Practice
11 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →

1. At a Glance

  • Nuclear Energy Mission (NEM), launched via Union Budget 2025–26, targets 100 GWe nuclear capacity by 2047 to support Viksit Bharat and net-zero by 2070 [1].
  • Mission also mandates ≥5 indigenous Small Modular Reactors (SMRs) operational by 2033 [1].
  • Backed by a new standalone law — the SHANTI Act, 2025 — that restructures India's nuclear legal architecture and opens the door to private participation [1][2].
  • High-yield UPSC topic: bridges GS-III (energy security, S&T) with GS-II (legislation/governance).

2. Why in the News

  • PIB (Department of Atomic Energy) issued a Parliament Question reply dated 23 Jul 2026 detailing progress on NEM — SMR design status, BARC's reactor portfolio, and the enacted SHANTI Act [1].

3. Background & Evolution

  • 2025–26 Union Budget: NEM announced with ₹20,000 crore allocation (announcement-level, per budget speech) for SMR R&D, aiming for 100 GW by 2047 [1].
  • BARC tasked with design/development of three indigenous SMR variants under the mission [1].
  • 15 Dec 2025: SHANTI Bill, 2025 introduced in Parliament by MoS (S&T) Dr Jitendra Singh [2].
  • 17 Dec 2025: Passed by Lok Sabha; 18 Dec 2025: passed by Rajya Sabha [2].
  • 20 Dec 2025: Presidential assent granted — SHANTI Act, 2025 enacted [2].
  • Predecessor framework: Atomic Energy Act, 1962 and Civil Liability for Nuclear Damage Act, 2010, which SHANTI Act consolidates/modernises [2].

4. Core Static Facts

Item Detail
Implementing Department Department of Atomic Energy (DAE) [1]
Design agency BARC (Bhabha Atomic Research Centre) [1]
Enacted law SHANTI Act, 2025 (Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India) [2]
Overall target 100 GWe by 2047 [1]
SMR target ≥5 indigenous SMRs operational by 2033 [1]
BSMR-200 220 MWe reactor, in-principle approval obtained [1]
SMR-55 55 MWe reactor, in-principle approval obtained [1]
HTGCR Up to 5 MWth, High Temperature Gas Cooled Reactor for hydrogen production [1]
Net-zero linkage Aligned to India's net-zero by 2070 commitment [1]
Consolidates Atomic Energy Act, 1962 + Civil Liability for Nuclear Damage Act, 2010 [2]

5. Multi-Dimensional Analysis

  • Scientific/Technological: Three distinct BARC-designed reactor lines (BSMR-200, SMR-55, HTGCR) reflect diversification — power generation vs. process-heat/hydrogen applications [1].
  • Legal/Constitutional: SHANTI Act creates a unified statutory regime replacing two separate 1962/2010 laws, altering liability and regulatory structure for nuclear operations [2].
  • Economic: 100 GWe target implies massive capital mobilisation and is explicitly tied to opening the sector for private/non-DAE participation (per SHANTI Act's liberalisation intent) [2].
  • Environmental: HTGCR's hydrogen-production role links nuclear energy policy to India's green hydrogen and decarbonisation goals [1].
  • Governance/Administrative: Shift from DAE-monopoly public-sector nuclear generation toward a regulated private-entry model signals a structural governance change [2].

6. Recent Developments (last 12–18 months)

  • Union Budget 2025–26: NEM formally announced.
  • 15–20 Dec 2025: SHANTI Bill introduced, passed by both Houses, and given presidential assent as SHANTI Act, 2025 [2].
  • 23 Jul 2026: DAE's Parliament reply confirms in-principle design/administrative approvals for BSMR-200, SMR-55, and HTGCR [1].

7. Prelims Hooks

  • NEM was announced in the Union Budget 2025–26 [1].
  • NEM's overarching target: 100 GWe nuclear capacity by 2047 [1].
  • Net-zero carbon emissions target year referenced: 2070 [1].
  • SMR operationalisation target: at least 5 indigenous SMRs by 2033 [1].
  • Nodal design agency for SMRs: BARC, not NPCIL [1].
  • BSMR-200 = Bharat Small Modular Reactor, capacity 220 MWe [1].
  • SMR-55 capacity: 55 MWe [1].
  • HTGCR = High Temperature Gas Cooled Reactor, capacity up to 5 MWth, purpose: hydrogen production [1].
  • Enabling legislation: SHANTI Act, 2025 [1][2].
  • SHANTI = Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India [2].
  • SHANTI Bill introduced by Dr Jitendra Singh, MoS (Science & Technology) on 15 Dec 2025 [2].
  • Passed by Lok Sabha: 17 Dec 2025; Rajya Sabha: 18 Dec 2025 [2].
  • Presidential assent to SHANTI Act: 20 Dec 2025 by President Droupadi Murmu [2].
  • SHANTI Act consolidates the Atomic Energy Act, 1962 and Civil Liability for Nuclear Damage Act, 2010 [2].
  • Implementing department for NEM: Department of Atomic Energy (DAE) [1].

8. Mains Relevance

9. Related Topics to Study Next

  • Civil Liability for Nuclear Damage Act, 2010 — being subsumed/reformed by SHANTI Act.
  • Atomic Energy Act, 1962 — original statutory basis for nuclear sector.
  • International Thermonuclear Experimental Reactor (ITER) — India's fusion energy participation.
  • National Green Hydrogen Mission — links to HTGCR's hydrogen-production role.
  • India's Panchamrit/NDC commitments (COP26) — source of the 2070 net-zero target.
  • NPCIL (Nuclear Power Corporation of India Ltd.) — existing PSU nuclear operator, contrast with new private-entry model.
  • Small Modular Reactors globally (IAEA classification) — comparative technology context.

10. Common Errors / Trap Areas

  • Confusing BARC (design/R&D agency) with NPCIL (operational PSU) as the nodal body for SMR design.
  • Mixing up the 100 GWe (2047) overall target with the 5 SMRs (2033) sub-target — these are distinct milestones.
  • Assuming SHANTI Act replaces the 1962/2010 Acts outright — it consolidates/modernises them into one framework, not a simple repeal.
  • Misremembering the enactment year — Bill introduced Dec 2025, but NEM itself was announced in the 2025–26 Budget (earlier).
  • Confusing HTGCR's output metric — it is measured in MWth (thermal), not MWe (electric), reflecting its non-power (hydrogen) application.

Sources

  1. 1Parliament Question: Progress under Nuclear Energy Missionpib.gov.in · tier 1
  2. 2The Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Bill — PIB static documentstatic.pib.gov.in · tier 1
At the end · practice MCQs
11 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →

Mains Q&A on this note

Also on 23 July

All 23 July articles →