Class-I local supplier
Also called: Class-II local supplier, Non-local supplier · Topic: Industrial Policy, Public Sector, MSMEs and Disinvestment · NCERT: Beyond NCERT
Meaning
Class-I local supplier, Class-II local supplier and non-local supplier are the three groups that bidders in government tenders are sorted into under the Public Procurement (Preference to Make in India) Order, 2017 (PPP-MII). Each bidder is placed by how much of its product's value is made in India. A Class-I supplier crosses the highest local-content cut-off. A Class-II supplier crosses a lower one. A non-local supplier is below the Class-II cut-off.
This sorting matters because preference in government buying works only if there is a clear test of what counts as "local". Class-I suppliers get purchase preference, which means first claim on the contract under set conditions. Government is a very large buyer, so this creates steady demand for goods made in India.
Formula
Local content (%) = [(Total value of the item − Value of imported content in it) ÷ Total value of the item] × 100
Local content is measured as Domestic Value Addition (DVA), the share of a product's value created in India.
Explanation
How the sorting works
- Step 1: the bidder declares its local content.
-
The manufacturer certifies its own DVA in a standardised format. It is checked objectively "where required".
-
Step 2: the buyer places the bidder in a class.
- Class-I local supplier: local content at or above the Order's highest cut-off.
- Class-II local supplier: local content at or above a lower cut-off, but below the Class-I level.
-
Non-local supplier: local content below the Class-II cut-off.
-
Step 3: preference is applied in the tender.
- Class-I suppliers get purchase preference.
- The usual rule (match L1):
- L1 is the lowest bid.
- Say a Class-I supplier is not L1, but its price is within a set margin of purchase preference of L1.
- The buyer then invites it to match the L1 price.
- If it agrees, it gets the contract, or a share of it.
-
Class-II and non-local suppliers get weaker treatment or none, and in some tenders they may be kept out entirely.
-
Note on the cut-offs: the study material could not confirm the exact percentage cut-offs for Class-I and Class-II from official sources. Check them in the latest DPIIT order before you memorise them.
Who sets the rules
- The parent framework is the PPP-MII Order, 2017.
- It was issued under Rule 153(iii) of the General Financial Rules (GFR), 2017. GFR is the rulebook for how central government spends money.
- It is an executive order, not an Act of Parliament.
-
It was amended on 28 May 2018.
-
Ministry roles
- The Order is a Ministry of Commerce & Industry framework.
-
Each nodal ministry (the ministry in charge of a product sector) notifies how to calculate DVA for its own products. For IT hardware this is MeitY.
-
Grievances go to a Standing Committee set up under the Order. It oversees how the Order is implemented and settles disputes.
How the "local" test is getting stricter (IT-hardware example)
- Old method: MeitY's DVA methodology of 07 September 2020.
- New method: revised by MeitY on 20 November 2026 for 6 products:
- Desktop/All-in-One PCs;
- Laptop PCs;
- Thin Clients;
- Servers;
- Computer Monitors;
-
Interactive Flat Panel Displays (IFPDs).
-
What changed: the method is now process-oriented and based on the Bill of Materials (BoM), the full list of parts in a product.
- Steps that earn credit include:
- SMT (Surface Mount Technology, fixing components onto the mainboard) mainboard assembly;
- using a domestic bare PCB;
- RAM and SSD assembly, testing and packaging;
- display assembly;
- a domestic chassis;
- the power module;
-
final assembly and testing.
-
Extra weightage
- In-house R&D in India gets "adequate" weightage.
-
Indian design and IPR get "additional" weightage.
-
When it applies: 6 months after publication in the Official Gazette.
- What this means for the classes: a firm that only does "screwdriver" final assembly will now find it harder to qualify as Class-I.
Worked example (illustrative numbers)
- A laptop is quoted at Rs 50,000. Its imported parts, including customs duty, are worth Rs 22,000.
- Local content = (50,000 − 22,000) ÷ 50,000 × 100 = 56%.
- The bidder compares 56% with the cut-offs in the Order:
- at or above the Class-I cut-off → Class-I (gets purchase preference);
- between the Class-II and Class-I cut-offs → Class-II;
-
below the Class-II cut-off → non-local.
-
What raises the score: more value made in India, such as a local PCB, local SMT assembly or Indian design.
- What lowers it: imported ready-made sub-assemblies, for example an imported finished mainboard.
In India
- Legal basis: the PPP-MII Order, 2017, issued under Rule 153(iii) of GFR 2017.
- Who manages it:
- the Ministry of Commerce & Industry framework (DPIIT) for the Order itself;
- nodal ministries such as MeitY for product-specific DVA rules;
-
the Standing Committee for grievances.
-
Where it is applied: in government tenders, mainly on GeM (Government e-Marketplace), the online portal where government offices buy goods and services.
- Link to the manufacturing push: it is the demand-side partner of supply-side schemes.
- Make in India started in September 2014.
- PLI 2.0 for IT hardware has a Rs 17,000 crore outlay. It covers laptops, tablets, all-in-one PCs, servers and ultra-small form factor devices.
-
PLI pays makers. Class-I preference gives them a buyer.
-
Trade-law room: India is only an observer in the WTO Government Procurement Agreement (GPA), not a party. So it is free to prefer local suppliers in its own government purchases.
Don't confuse with
- Local content requirement (LCR): a general condition that a set share of a product must be made at home. Class-I/Class-II is India's specific way of grading bidders in government tenders by local content. It is a preference tool, not a blanket rule on all sales.
- Production-linked incentive (PLI): PLI is a supply-side cash reward paid on incremental sales over a base year (FY20). Class-I preference is a demand-side tool: the government buys from local suppliers.
- Restrictions on bidders from land-border-sharing countries (GFR, 2020): these depend on the bidder's country. The Class-I/II/non-local grading depends on the product's local content. They are two separate safeguards.
- DVA vs local content: these are not two different tests. DVA is the value-based measure of local content.
Prelims Hooks
- The PPP-MII Order is from 2017, issued under Rule 153(iii), GFR 2017, and amended on 28.05.2018. It is an executive order, not an Act. Trap: "Order 2020". 07 Sep 2020 is the date of MeitY's DVA methodology, not of the Order.
- Only Class-I local suppliers get purchase preference. Class-II suppliers are "local" but get weaker or no preference.
- Product-specific DVA rules come from the nodal ministry. For IT hardware this is MeitY, not DPIIT and not the Department of Expenditure.
- The revised IT-hardware DVA method covers 6 products, including Thin Clients and IFPDs. It is BoM-based and applies 6 months after Gazette publication.
- Local content is self-certified by the supplier, with verification where required. Grievances go to the Standing Committee under the Order.
- India is an observer, not a party, in the WTO GPA, so local preference in government buying is allowed.
Mains Points
- Public procurement as industrial policy
- For: assured government orders let new factories grow to an efficient size, which a subsidy alone cannot guarantee.
- Against: buyers may pay more, or get fewer bids, while domestic supply chains are still thin. This risk is highest for complex items like servers.
-
The fair test is the result: track bid prices and the number of bidders on GeM after the rule applies, and adjust the weights if they get worse.
-
"Local" must mean depth, not assembly
- The process-based BoM method rewards PCB, SMT, packaging, design and IPR, not just final assembly.
- Limit 1: the processor chip itself is not on the list of credited steps. So a high Class-I score does not mean the product is technologically independent.
- Limit 2: self-certification, with checks that mostly begin only after a rival complains, invites over-claiming.
-
Fixes: publish the R&D and design weights as numbers, and run random BoM checks.
-
Making the tools work together
- Class-I preference (demand side) and PLI 2.0 (supply side) should send the same signal.
- India can use preference because it is outside the WTO GPA. But trade agreements that open government procurement to partners will narrow this room. A clear, value-based test of "local" is easier to defend in those talks than a ban on imports.