Meaning

A Generation Based Incentive (GBI) is a payment to a wind power project for each unit of electricity it actually produces and supplies. The support is linked to output, so a project earns more only when its turbines run well. It does not pay for building the plant. In India, GBI was available only to wind projects commissioned (built and running) before March 2017. After that, wind support moved to competitive bidding and newer tools such as viability gap funding and contracts for difference.

Example

A wind farm commissioned in 2015 sold its power to a DISCOM (state power distribution company) and also received GBI on every unit it generated. A farm commissioned in 2018 got no GBI. It had to win a contract through competitive bidding, where tariffs fell from about ₹4–5 per unit to about ₹2.5–3 per unit. Losing GBI at the same time as tariffs fell is one reason wind additions slowed after 2017.

Don't confuse with

  • Viability gap funding (VGF): a one-time capital grant paid when a project is built, to make an unviable project bankable. GBI is paid on output over time. For example, ₹6,853 crore of VGF was approved for 1,000 MW of offshore wind.
  • Feed-in tariff: the fixed price paid for the power itself. GBI was an extra payment per unit, on top of that price.