Power evacuation

Indian Economy glossary

FlashcardsQuick reviseKey facts. One by one.Start →

Also called: Transmission evacuation · Topic: Infrastructure: Transport, Communications and Energy · NCERT: Beyond NCERT

Meaning

Power evacuation means carrying electricity out of a generating plant and into the grid through transmission lines and substations. A transmission line is a high-voltage line that carries power over long distances. A plant can sell power only if it is connected to the grid. If the lines are late, a finished plant cannot supply anyone. It is then forced to switch off or cut its output, and that power is wasted. Planning evacuation before or alongside the plant is a key part of energy infrastructure, especially for solar and wind parks built in remote, sunny or windy areas.

Example

Rajasthan has some of India's best land for solar parks. Many plants there were finished before the high-voltage lines that carry power out of the state, such as the 765 kV Khetri–Narela line. Without enough evacuation capacity, these plants were curtailed (forced to cut output) during peak solar hours, so the owners lost income. India's Green Energy Corridor programme builds transmission lines for renewable energy so that evacuation is ready when a plant starts running.

Don't confuse with

  • Curtailment: this means forcing a plant to cut its output. It is often the result of poor power evacuation. It is not the same thing as evacuation.
  • Distribution: this is the last stage, where a discom (state electricity distribution company) delivers power to homes and shops through low-voltage lines. Power evacuation is the first stage, where power travels from the plant into the high-voltage grid.