Tape-out

Indian Economy glossary

Also called: Chip tape-out · Topic: Industrial Policy, Public Sector, MSMEs and Disinvestment · NCERT: Beyond NCERT

Meaning

Tape-out is the last step of designing a computer chip. The design is finished and checked, and the final layout is sent to a fab (a chip factory) so it can be made. The name comes from the early days, when designs were sent to the factory on magnetic tape. After tape-out, the fab makes masks (stencils used to print the circuits on silicon) and then the first chips. Tape-out matters because it shows real design skill. A country or firm can design chips and tape them out without owning a fab. So the number of tape-outs is a good measure of a country's chip-design activity.

Example

Under the India Semiconductor Mission (2021, Rs 76,000 crore), the design-linked incentive (DLI) pays for chip-design work done at home. When a startup or institution supported this way finishes its design and sends it to a foundry to be made, that is a tape-out. It counts as Indian design output even if the chip is made in a factory abroad.

Don't confuse with

  • Fabrication: tape-out is where design ends and the design is handed over. Fabrication is the actual making of the chip in the fab, which comes after tape-out.
  • Design-linked incentive (DLI): DLI is a government scheme that rewards spending on chip design. Tape-out is a stage in the design process, and DLI can help a project reach it.

Read more