Meaning
The Coal Mines (Special Provisions) Act, 2015 (CMSP Act) is a central law that lets the government give out coal mines again in two ways: by auction (open bidding) to companies, or by allotment (direct grant) to central and state government companies. It was passed after the Supreme Court cancelled 214 coal block allocations in 2014.
It matters because it replaced a discretionary system that was not transparent with a system based on bidding. Later reforms opened coal to commercial mining, and auctions of that kind began in 2020.
Explanation
Why the Act was needed (cause → process → result)
- Cause: the old allocation system was struck down
- For years, coal blocks were handed out by a screening committee, not by bidding.
-
In 2014 the Supreme Court held most of these allocations illegal and cancelled 214 of them. The public called this the "coal block allocation case" (Coalgate).
-
Process: a quick law to restart the cancelled mines
- The government first issued an Ordinance in 2014. Parliament then passed the CMSP Act in 2015 to replace it.
-
The cancelled mines were taken back and offered again under new rules.
-
Result: coal mines are now given out mainly by bidding
- Mines went back into production with new owners, so coal supply to power, steel and cement plants kept going.
How the Act works: its main parts
- Auction: private and public companies bid for a coal mine. The highest valid bid wins.
- Allotment: a mine can be given directly to a government company, such as a state power company or a central public sector company.
- Nominated authority: an office under the Ministry of Coal that runs the auctions and allotments, signs the agreements and hands over the mines.
- Revenue to states: the money from auctions and allotments goes to the coal-bearing states, where the mines are.
- Transfer of land and assets: the new owner of a cancelled mine takes over its land, mining rights and clearances, so work does not have to start from zero.
Captive mining vs commercial mining
- Captive mining (the first stage): at first, the winning firm could use the coal only in its own plant (its "end use"), such as a power, steel or cement plant.
- Commercial mining (the later stage): the end-use limit was later removed, so a firm can now mine coal and sell it in the open market. Commercial auctions of coal blocks began in 2020.
- Coal India still produces most of India's coal. Auctioned and allotted blocks add to that supply.
Conditions for a block to start producing
- An auctioned or allotted block cannot start mining at once. It first needs:
- a geological report, prepared by an Accredited Prospecting Agency (APA)
-
a mining plan, prepared by a Mining Plan Preparing Agency (MPPA)
-
Mining plans approved through the Single Window Clearance System (SWCS) took about 4.5 months, against 9–12 months before SWCS.
- Delays in forest clearance and State permission to drill in forest areas still hold up exploration on many blocks.
Where it occurs
- Who runs it: the Ministry of Coal, through the nominated authority, from 2015.
- Where the blocks are: mostly in the Gondwana coalfields, which hold about 98 per cent of reserves, in the Damodar, Sone, Mahanadi and Godavari valleys.
- Odisha, Jharkhand and Chhattisgarh hold about 70 per cent of reserves, so they have most of the blocks and receive most of the auction revenue.
-
Fields include Talcher and Ib valley (Odisha), Korba and Hasdeo Arand (Chhattisgarh), Jharia and Karanpura (Jharkhand), and Singrauli (Madhya Pradesh–Uttar Pradesh border).
-
Example of allotment to a state government company: blocks in the Hasdeo Arand coalfield (north Chhattisgarh) are mined for Rajasthan's state power company. The area lies under dense sal forest that is an elephant corridor and home to Gond villages, and mining there has faced long protests.
- Results: India's coal production crossed one billion tonnes in FY2024-25. Total coal imports fell from 24.27 MT in April 2025 to 21.13 MT in April 2026.
Don't confuse with
- MMDR Act, 1957: this is the parent law for mines and minerals in general, and the Mineral Concession Rules, 1960 are framed under it. The CMSP Act is a special law for coal mines, made first to deal with the allocations cancelled in 2014.
- Coal Mines (Nationalisation) Act, 1973: this law brought coal mining under the government and created a public-sector near-monopoly. The CMSP Act did the opposite: it opened mines to bidding by private firms.
- Mineral Concession (Third Amendment) Rules, 2026: these are rules (delegated legislation), notified as G.S.R. 999(E). They extend APA and MPPA accreditation from 3 to 5 years. They are not an Act, and they do not decide who gets a coal block.
- Captive vs commercial mining: under captive mining, coal is used only in the owner's own plant. Under commercial mining, the coal can be sold in the open market (auctions began in 2020).
Prelims Hooks
- The CMSP Act came after the Supreme Court cancelled 214 coal block allocations in 2014. It was first an Ordinance and became an Act in 2015.
- There are two routes under the Act: auction for any eligible company, and allotment for government companies.
- Auction revenue goes to the coal-bearing states, not to the Centre.
- The Act is run by the Ministry of Coal, not the Ministry of Mines.
- Commercial coal block auctions began in 2020. Before that, blocks were limited to captive (own) use.
- Trap: "The CMSP Act set up the accreditation of APAs and MPPAs" is FALSE. Accreditation comes under the Mineral Concession Rules, 1960, framed under the MMDR Act, 1957.
Mains Points
- Transparency and energy security (GS-III)
- Bidding replaced discretionary allocation, which cut room for favouritism and brought revenue to Odisha, Jharkhand and Chhattisgarh.
-
Auctioned and allotted blocks helped production cross one billion tonnes in FY2024-25 and helped reduce coal imports.
-
Bottlenecks remain after the auction
- A block still needs a geological report and a mining plan, and forest clearance and permission to drill in forest areas are often delayed.
-
CAG found that the mine dossiers for nine auctioned coal mines had no approved mine closure plans. Speed has to be balanced with proper closure and restoration of mined land.
-
Environment and people versus coal supply
- Hasdeo Arand shows the conflict: coal for a state power company on one side, sal forest, an elephant corridor and Gond villages on the other.
- Faster mining also has to fit with net zero by 2070 and a just energy transition for coal workers and coal districts in Jharkhand, Chhattisgarh and Odisha.