Operational draft
Also called: Draft · Topic: International Trade: Patterns, Ports and the WTO · NCERT: Beyond NCERT
Meaning
Draft is how deep a ship sits in the water. It is measured from the waterline down to the bottom of the hull. A fully loaded ship sinks lower, so its draft grows. A port's operational draft is the greatest draft a ship can have and still use the port safely when loaded to its load line (the mark showing the deepest it may legally sit). The depth of the port's channel and berths (the places where ships tie up) sets this limit. A deeper operational draft lets bigger ships come in fully loaded, and that lowers the freight cost for each tonne or container. Ports raise it by capital dredging, which means digging out seabed material to make the channel deeper.
Example
After Capital Dredging Phase VI in July 2026, Kamarajar Port (formerly Ennore Port) in Tamil Nadu reached an 18 m operational draft. Now fully laden Capesize vessels (the largest dry-bulk ships) of up to 1,70,000 DWT (deadweight tonnage, the total weight a ship can carry) can call there. It is the second major port in India with this draft, after Visakhapatnam.
Don't confuse with
- Water depth along the berth: this is the actual depth of water at the quay. At Kamarajar it is 20 m, while the draft is 18 m. The extra 2 m is a safety margin under the ship's keel.
- Maintenance dredging: this only keeps an existing depth by clearing silt. Capital dredging makes a port deeper and so raises its operational draft.