Peaking power

Geography glossary

Also called: Peaking hydropower · Topic: Energy Resources of India: Conventional and Non-conventional · NCERT: Beyond NCERT

Meaning

Peaking power means running a hydropower dam mostly during peak-demand hours, the few hours of the day when people use the most electricity, such as the evening. Hydel turbines can be switched on and off in minutes, while coal plants cannot, so dams are well suited to meet these short spikes. The dam holds back water for most of the day and releases a large flow only during the peak hours. Below the dam, the river rises sharply for a few hours and then shrinks to very little water. This daily swing can wash away fishing gear, flood riverbank fields, erode banks and harm fish. It is a key reason why people downstream oppose large Himalayan dams.

Example

The Subansiri Lower Hydroelectric Project (2,000 MW, NHPC) lies on the Arunachal Pradesh–Assam border. People in the Assam plains feared daily flow swings and floods, and protests stopped its construction from 2011 to 2019. An expert committee then recommended a minimum downstream flow, meaning a fixed amount of water that must always be released into the river.

Don't confuse with

  • Base-load power: the steady, round-the-clock supply that meets the lowest level of demand, mostly from coal in India. Peaking power covers only the short daily spikes above that level.
  • Pumped storage hydropower: it also serves peak demand, but it pumps water uphill into a reservoir when power is cheap and reuses it. Peaking is about the timing of releases from an ordinary dam on a river.

Read more