Meaning
A semiconductor fabrication plant (fab, or wafer fab) is a factory that builds tiny electronic circuits, layer by layer, onto thin round slices of silicon called wafers. Each finished wafer is later cut into many chips. The fab is the most expensive and most technology-heavy part of the chip supply chain. This is why India's chip policy treats getting a working fab as the hardest goal to reach.
Explanation
How a fab fits into chipmaking
- Chipmaking has three main stages:
- Design: engineers draw the circuit using EDA (Electronic Design Automation, the software used to design chips).
- Fabrication (the fab): the design is built onto silicon wafers. This is the "front end" of chipmaking.
-
ATMP/OSAT: ATMP stands for Assembly, Testing, Marking and Packaging. OSAT stands for Outsourced Semiconductor Assembly and Test. In this stage the wafer is cut into chips, and each chip is sealed, tested and labelled. This is the "back end".
-
A fab needs the costliest machines, materials and skills in the chain. That is why, under Semicon 1.0, fabs got 50% fiscal support of project cost on a pari-passu basis. Pari-passu means the government's share is paid out in step with the company's own spending.
Types of fabs
- Pillar 3 of Semicon 2.0, called More Fabs, covers four kinds of fab:
- Silicon fabs: standard chips made on silicon wafers.
- Compound semiconductor fabs: chips made from mixes of elements instead of pure silicon.
- Discrete device fabs: single-function parts such as power devices.
-
Display fabs: screens and display panels.
-
Pillar 5 (R&D) aims for more advanced nodes through work with R&D centres. A "node" is a generation of chip technology. Newer nodes have smaller, more tightly packed circuits.
Conditions a fab needs (location factors)
- It is a high-tech industry, but it is not footloose. A footloose industry can locate almost anywhere. A fab cannot, because it is tied to certain inputs:
- Reliable water and power: the plant uses large amounts of both and cannot afford breaks in supply.
- Ultra-pure chemicals and gases: these are major global chokepoints, which is why Pillar 2 (Machines and Materials) targets at least 3 major equipment makers and 5 chemicals and gases companies.
- Skilled engineers: built up through Pillar 6 (Talent) and the Chips to Startup (C2S) programme.
-
Land, policy support and port access: these are the reasons Gujarat was chosen.
-
Very high cost and long building times: a fab can stall for years between approval and production. India's 2013 attempt showed this (see Mains Points).
Where it occurs
- India's first approved commercial fab: the Tata-PSMC fab at Dholera, Gujarat, approved in 2024.
- Dholera Special Investment Region is a new city built from scratch on the Gulf of Khambhat.
-
It is a node of the Delhi-Mumbai Industrial Corridor.
-
Packaging units around it, which are not fabs: the Micron assembly and test plant and the CG Power and Kaynes units at Sanand (Gujarat), and the Tata assembly unit at Jagiroad (Assam). Assam gives India an eastern location.
- Scale of the programme: a PIB count of Semicon 1.0 projects showed 2 fabs and 8 packaging units, worth about ₹1.6 lakh crore. The total later rose to 12 projects in 6 states, worth over ₹1.64 lakh crore.
- Who runs it: the India Semiconductor Mission (ISM), set up in December 2021 with ₹76,000 crore. It is an Independent Business Division within Digital India Corporation under MeitY (Ministry of Electronics and Information Technology). Semicon 2.0 was approved on 15 July 2026 with ₹1,27,500 crore.
- The world: governments are competing to attract fabs with subsidies. These subsidies have risen sharply since at least 2020, and Chinese firms get the largest subsidies relative to their revenue.
Don't confuse with
- ATMP/OSAT unit: this unit packages and tests chips that are already made. It does not build circuits on wafers. Micron Sanand and Tata Jagiroad are packaging units. Dholera is the fab.
- Chip design: design is drawing circuits with EDA software, and it needs no factory. It is supported by the Product Design Linked Incentive, capped at ₹15 crore per application.
- ECMS (Electronics Components Manufacturing Scheme): a separate MeitY scheme for components and materials such as copper foil and cathode material. It is not part of ISM and does not fund fabs.
- Footloose industry: a footloose industry can locate almost anywhere. A fab is high-tech but tied to water, power, pure chemicals and skilled staff.
Prelims Hooks
- Dholera (Gujarat) has a fab (Tata-PSMC). Sanand (Gujarat) and Jagiroad (Assam) have assembly or packaging units, not fabs.
- Dholera SIR lies on the Gulf of Khambhat and is a DMIC node.
- Semicon 1.0 gave fabs 50% fiscal support on a pari-passu basis.
- Semicon 2.0's Pillar 3 is "More Fabs" (silicon, compound, discrete, display). Pillar 4 is ATMP/OSAT, not R&D.
- In the PIB count of 10 Semicon 1.0 projects, only 2 were fabs and 8 were packaging units.
- In September 2013, two fab consortia got in-principle approval: Jaiprakash Associates with IBM and Tower Semiconductor, and HSMC Technologies with ST Microelectronics and Silterra.
Mains Points
- Location geography of fabs: why Gujarat?
- A fab needs reliable water and power, ultra-pure chemicals and skilled engineers.
- Gujarat offered land, policy support and ports. Dholera adds DMIC connectivity.
-
Critique: building at Dholera puts its coastal ecology at risk.
-
Approval is not production: the 2013 lesson.
- Letters of Intent were issued in March 2014.
- By November 2014, gaps were found in the detailed project reports, and both consortia asked for more time.
- In January 2015, the Empowered Committee overseeing the projects had to be reconstituted.
-
Today, only 5 of 12 Semicon 1.0 projects are in commercial production. Fund use was only 23% in 2023-24 and 9% in 2024-25, because incentives are paid only after milestones are met.
-
Should India chase fabs first?
- The OECD argues that bringing the whole chain onshore is unrealistic, and that countries should coordinate their policies instead.
- A balanced answer: put packaging, materials and design first, since packaging needs far less money to enter. Treat advanced fabs as a later, phased stage built with partner countries.