New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →Defence indigenisation means more than building weapons in India. It means India designs them and owns the technology. The fourth India-Japan 2+2 (Tokyo, 19 November 2026) endorsed "Design with Japan, Make in India" [1]. The framework moves the relationship from buying equipment to developing it together. It is promising, but so far it exists mostly on paper.
How co-development can advance indigenisation
- Design, not just assembly: under licensed production, the core know-how stays abroad. Joint design builds Indian engineering skills and shared intellectual property.
- Naval shipbuilding: the two sides are exploring joint development in naval shipbuilding and design [1]. This would pair Japanese shipbuilding experience with Indian shipyards.
- A first test project: India's Acceptance of Necessity (AoN) for the UNICORN naval antenna arrangements is targeted for February 2027 [1]. That would put the project into India's own defence procurement process.
- Institutional backing: the Joint Declaration on Security Cooperation (August 2025) and the Navy–JMSDF Memorandum of Arrangement on Maritime Security give the work a policy base and a user who needs the equipment [1].
- Technology spillovers: economic-security cooperation in semiconductors and critical minerals, and the Japan-India AI Cooperation Initiative (JAI), supply dual-use inputs for defence electronics [1].
Limitations
- Slow delivery: the first 2+2 met in 2019 [2], yet no weapon has been built jointly. UNICORN has not even reached AoN, which is only the first approval step [1].
- Soft wording: "exploring" shipbuilding commits neither side to funds, a timeline or a specific ship [1].
- Infrequent review: there have been only four 2+2 rounds in seven years [1][2], so a stalled project can wait years before ministers look at it again.
- No named projects: the economic-security track lists sectors but no specific plants or funding [1].
Way forward
- Meet the February 2027 AoN date and announce a date for signing the contract.
- Use 2027, the Year of Shared Horizons (75 years of ties) [1], as the deadline to name one shipbuilding project.
- Write IP-sharing and Indian-content terms into the agreements.
Overall, co-development can push India from assembling defence equipment towards designing it. Whether it does depends on turning frameworks into contracts. If the projects are carried out with clear timelines, "Design with Japan, Make in India" can become a working model of Aatmanirbhar Bharat in defence, and of a Special Strategic and Global Partnership that delivers [1].
Sources
- 1Joint Statement: Fourth India-Japan 2+2 Foreign and Defence Ministerial Meeting, PIB (19 November 2026)"Design with Japan, Make in India"; exploring naval shipbuilding; UNICORN AoN target of February 2027; Navy–JMSDF Memorandum of Arrangement; Joint Declaration on Security Cooperation (August 2025); strategic sectors; JAI; four rounds; Year of Shared Horizons in 2027